The Official Website of the Executive Office of Energy and Environmental Affairs (EOEEA)
Docket:
Docket Details
TypeDocketNameSubjectSummaryFiledClosedCategory
EFSBEFSB12-1/DPU12-46/47New England Power Company d/b/a National GridPetition of New England Power Company d/b/a National Grid to construct and operate a new overhead 345-kV transmission line along the existing righ-of-way, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, Massachusetts. Petition of New England Power Company d/b/a National Grid for Exemptions from the Zoning Bylaws of the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville in Connection with the Proposed Construction and Operation of a New 345-kV, Overhead Transmission Line and Related Facility Improvements, pursuant to G.L. c. 40A, § 3. Petition of New England Power Company d/b/a National Grid for Approval by the Department of Public Utilities to Construct and Operate a New 345 kV Transmission Line, pursuant to G.L. c. 164, § 72.TRANSMISSION LINE6/21/2012  


Docket Electronic Filings
 DescriptionDateMemoURL
 4/15/2014Counsel for NGRID files supplemental response to RR-EFSB-14 
Second Supplemental Responses3/18/2014Counsel for NGRID files 2nd supplemental response to EFSB-LU-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31814efsbrsp2.pdf
Supplemental Responses3/12/2014Counsel for NGRID files supplemental responses to RR-EFSB-46 and EFSB-LU-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31214ngrdsprsp.pdf
Email2/27/2014Counsel for NGRID advises that NGRID does not object to admission of this exhibit and notes that EFSB-41 is actually comments on draft reports rather than on final reportshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22714ngrdeml.pdf
Exhibit EFSB-412/25/2014Presiding Officer forwards Exhibit EFSB-41 to parties for reviewhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22514efsbex41.pdf
Responses to EFSB-RR-652/21/2014Counsel for ISO-NE files response to RR-EFSB-65http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22114isonersp.pdf
 2/18/2014Transcript of Jan. 30th Board Meeting received from FAB 
Additional Record Request2/12/2014Presiding Officer issues additional record request to ISO NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbrcrq.pdf
Exhibit EFSB-362/12/2014Presiding Officer forwards proposed EFSB exhibits to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbex36.pdf
Exhibit EFSB-372/12/2014Presiding Officer forwards proposed EFSB exhibits to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbex37.pdf
Exhibit EFSB-382/12/2014Presiding Officer forwards proposed EFSB exhibits to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbex38.pdf
Exhibit EFSB-392/12/2014Presiding Officer forwards proposed EFSB exhibits to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbex39.pdf
Exhibit EFSB-402/12/2014Presiding Officer forwards proposed EFSB exhibits to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21214efsbex40.pdf
Email1/28/2014Counsel for AG advises it has no comments on the Issues Memorandumhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12814ageml.pdf
Comments1/28/2014Counsel for ISO NE files comments on the Issues Memorandumhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12814isonecmn.pdf
Comments1/28/2014Counsel for NGRID files comments on the Issues Memorandumhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12814ngridcmn.pdf
Memorandum1/23/2014Presiding Officer forwards Issues Memorandum to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12314efsbmem.pdf
Email1/21/2014Presiding Officer advises parties that the Issues Memorandum relative to the Jan. 30th EFSB Meeting will be issued shortlyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12114efsbltr.pdf
Responses12/23/2013Counsel for NGRID files supplemental response to RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/122313ngrsp.pdf
Withdrawal of Counsel12/4/2013Counsel for Attorney General files Withdrawal of Patrick Tarmey as counselhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12413agwdcn.pdf
Cover Letter11/1/2013Counsel for NGRID files its Initial Brief, along with supplemental responses to EFSB-W-3 and EFSB-LU-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113nginbcl.pdf
Certificate of Service11/1/2013Counsel for NGRID files its Initial Brief, along with supplemental responses to EFSB-W-3 and EFSB-LU-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113nginbcs.pdf
Initial Brief11/1/2013Counsel for NGRID files its Initial Brief, along with supplemental responses to EFSB-W-3 and EFSB-LU-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113nginbf.pdf
Responses to EFSB-LU-14 (Supp)11/1/2013Counsel for NGRID files its Initial Brief, along with supplemental responses to EFSB-W-3 and EFSB-LU-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113nginbr-14.pdf
Responses to EFSB-W-3 (Supp)11/1/2013Counsel for NGRID files its Initial Brief, along with supplemental responses to EFSB-W-3 and EFSB-LU-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113nginbr-3.pdf
Initial Brief11/1/2013Counsel for Attorney General files Initial Briefhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113aginbf.pdf
Initial Brief11/1/2013Counsel for ISO-NE files its Initial Briefhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113isoinbf.pdf
Responses to RR-EFSB-6110/18/2013Counsel for NGRID files supplemental response to RR-EFSB-61http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/101813ngr61.pdf
Email Requesting Supplemental Information10/11/2013Presiding Officer requests supplemental information regarding the impact of renewable power generation on the need for IRPhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/101113efsbirq.pdf
Cover Letter10/11/2013Counsel for NGRID files confidential and redacted second supplemental response to: RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/101113ngr-64cl.pdf
Responses to RR-EFSB-6410/11/2013Counsel for NGRID files confidential and redacted second supplemental response to: RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/101113ngr-64.pdf
Ruling10/7/2013Presiding Officer issues Ruling on Motion for Protective Treatment of RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10713efsbrul.pdf
Cover Letter10/7/2013Counsel for ISO-NE files confidential response to RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10713isorcl.pdf
Briefing Schedule10/4/2013Presiding Officer advises parties of due dates for initial briefs and reply briefshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10413efsbbsc.pdf
Proposed Briefing Schedule10/3/2013Counsel for NGRID forwards proposed briefing schedule to Presiding Officerhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10313ngltbs.pdf
Certificate of Service10/3/2013Counsel for NGRID forwards proposed briefing schedule to Presiding Officerhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10313ngltcs.pdf
Reply Letter10/2/2013Counsel for Attorney General withdraws its Opposition to ISO-NE’s Motion for Protective Treatment of RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10213agrplt.pdf
Response to RR-EFSB-64 (Supplemental)9/27/2013Counsel for NGRID files confidential and redacted supplemental response to RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92713ngsrsp.pdf
Cover Letter9/27/2013Counsel for NGRID files confidential and redacted supplemental response to RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92713ngsrcl.pdf
Email9/25/2013Presiding Officer notifies parties that the Attorney General has until Oct. 2nd to respond to ISO-NE’s letterhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92513efsbemlt.pdf
Cover Letter9/25/2013Counsel for ISO-NE files response to RR-EFSB-50http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92513isorcl.pdf
Responses to RR-EFSB-509/25/2013Counsel for ISO-NE files response to RR-EFSB-50http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92513isorsp.pdf
Cover Letter9/25/2013Counsel for NGRID files confidential and redacted response to RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92513ngrefsb-64cl.pdf
Response to RR-EFSB-649/25/2013Counsel for NGRID files confidential and redacted response to RR-EFSB-64http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92513ngrefsb-64.pdf
Response to AG Opposition9/24/2013Counsel for ISO-NE files letter responding to Attorney General’s opposition to ISO’s Motion for Protective Treatment of RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92413isorsp.pdf
Ruling9/24/2013Presiding Officer issues Ruling on NGRID’s Objection to Admission of Evidence into the recordhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92413efsbrul.pdf
Responses9/19/2013Counsel for NGRID files record request RR-EFSB-36, and supplemental response to RR-EFSB-38http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91913ngrsp.pdf
Opposition9/17/2013Counsel for Attorney General files Opposition to ISO-NE’s Motion for Protective Treatment of RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91713agopp.pdf
Responses9/16/2013Counsel for NGRID files record requests responses: RR-AG-6 and 5; RR-EFSB-37, 58, 59, 60, 61 and 63http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91613ngrsp.pdf
Cover Letter9/13/2013Counsel for ISO-NE files responses to: RR-EFSB-35, 38, and 51 through 55http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91313isorcl.pdf
Responses9/13/2013Counsel for ISO-NE files responses to: RR-EFSB-35, 38, and 51 through 55http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91313isorsp.pdf
Motion for Confidential Treatment9/11/2013Counsel for ISO-NE files Motion for Confidential Treatment of RR-EFSB-39http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91113isomtn.pdf
Cover Letter (Confidential)9/10/2013Counsel for NGRID files record requests responses: RR-AG-4 and 5; RR-EFSB-45, 46, 47 (redacted), 49, 57 and 62; revised response to AG-1-26; and confidential copies of RR-EFSB-47http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91013ngrcnfl.pdf
Responses9/10/2013Counsel for NGRID files record requests responses: RR-AG-4 and 5; RR-EFSB-45, 46, 47 (redacted), 49, 57 and 62; revised response to AG-1-26; and confidential copies of RR-EFSB-47http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91013ngrsp.pdf
Objection Letter9/6/2013Counsel for NGRID files an objection to the admission into evidence of certain exhibits submitted during hearingshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9613ngobj.pdf
Certificate of Service9/6/2013Counsel for NGRID files an objection to the admission into evidence of certain exhibits submitted during hearingshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9613ngobjcs.pdf
Cover Letter9/5/2013Counsel for ISO-NE files responses: RR-EFSB-34, 40, 41, 42 and 56http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9513isorcl.pdf
Responses of ISO-NE9/5/2013Counsel for ISO-NE files responses: RR-EFSB-34, 40, 41, 42 and 56http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9513isorsp.pdf
 8/30/2013Transcripts of Aug. 27th and 29th evidentiary hearings (Vol 7 & 8) received from FAB 
Responses8/30/2013Counsel for NGRID files responses: RR-AG-1, 2 and 3; and RR-EFSB-43, 44 and 48http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/83013ngrsp.pdf
 8/22/2013Transcripts of Aug. 14th and 20th evidentiary hearings (Vol 5 & 6) received from FAB 
Ruling8/21/2013Presiding Officer issues Ruling on NGRID’s Motion for Leave to File Supplemental Testimonyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82113efsbrl.pdf
 8/15/2013Counsel for ISO-NE files Attachment K (ISO-NE-2) 
Cover Letter8/13/2013Counsel for NGRID files Motion for Leave to File Supplemental Testimonyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/81313ngmtcl.pdf
Motion8/13/2013Counsel for NGRID files Motion for Leave to File Supplemental Testimonyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/81313ngmtn.pdf
Certificate of Service8/13/2013Counsel for NGRID files Motion for Leave to File Supplemental Testimonyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/81313ngmtcs.pdf
Cover Letter8/8/2013Counsel for NGRID files supplemental direct testimony of Judah Rosehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8813ngsptscl.pdf
Supplemental Direct Testimony8/8/2013Counsel for NGRID files supplemental direct testimony of Judah Rosehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8813ngspts.pdf
Certificate of Service8/8/2013Counsel for NGRID files supplemental direct testimony of Judah Rosehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8813ngsptscs.pdf
Cover Letter8/5/2013Counsel for NGRID files revised responses to: EFSB-PA-42 and 48http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8513ngrefsbcl.pdf
Response to EFSB-PA-42 (revised)8/5/2013Counsel for NGRID files revised responses to: EFSB-PA-42 and 48http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8513ngrefsb42.pdf
Response to EFSB-PA-48 (revised)8/5/2013Counsel for NGRID files revised responses to: EFSB-PA-42 and 48http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8513ngrefsb48.pdf
Responses7/19/2013Counsel for NGRID files responses to EFSB 4th Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71913ngrspefir4.pdf
Cover Letter6/27/2013Presiding Officer issues Fourth Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62713efsbir4cl.pdf
Information Request6/27/2013Presiding Officer issues Fourth Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62713efsbir4.pdf
Attachment6/27/2013Presiding Officer issues Fourth Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62713efsbir4at.pdf
Supplemental Response to EFSB-ISO-1496/24/2013Counsel for ISO-NE files supplement response to EFSB-ISO-149http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62413isosprsp.pdf
 6/24/2013Counsel for ISO-NE files confidential attachment: EFSB-ISO-174A 
Responses6/11/2013Counsel for ISO-NE files confidential and redacted responses to EFSB 3rd Set of Information Requests; revised response to EFSB-ISO-132; and CD of attachment EFSB-ISO-149Chttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/61113isorsp.pdf
Cover Letter5/14/2013Counsel for NGRID files response to RR-EFSB-26http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/51413ngrcl.pdf
Response to RR-EFSB-265/14/2013Counsel for NGRID files response to RR-EFSB-26http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/51413ngrsp.pdf
Certificate of Service5/14/2013Counsel for NGRID files response to RR-EFSB-26http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/51413ngrcs.pdf
EFSB's 3rd set of Information Requests5/13/2013Presiding Officer forwards 3rd Set of Information Requests to ISO-NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/51313efsbir3.pdf
Letter re Procedural Schedule4/29/2013Counsel for AG files comments on proposed hearing schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42913agcomn.pdf
Appearance of Counsel4/29/2013Erik Bennett files notice on appearance on behalf of Mass Attorney Generalhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42913agapcn.pdf
Letter re Draft Schedule4/29/2013Counsel for NGRID files comments on proposed hearing schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42913ngltps.pdf
Responses to Record Requests4/26/2013Counsel for NGRID files responses to: RR-EFSB-25 and 33http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42612ngrsprr.pdf
Email re New Draft Schedule4/23/2013Presiding Officer advises parties that a new draft schedule will be issued shortlyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42313efsbem.pdf
Draft Schedule4/23/2013Presiding Officer forwards draft proposed hearing schedule to parties and requests comments on same to be filed no later than 4/29http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/42313efsbdsch.pdf
Cover Letter (Redacted)4/9/2013Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-17 and 123 along with proposed Non-disclosure Agreement under Protective Orderhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4913isonerdrclrd.pdf
Cover Letter (Confidential)4/9/2013Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-17 and 123 along with proposed Non-disclosure Agreement under Protective Orderhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4913isonerdrclcnf.pdf
Certificate of Service4/9/2013Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-17 and 123 along with proposed Non-disclosure Agreement under Protective Orderhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4913isonerdrcs.pdf
Nondisclosure Agreement4/9/2013Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-17 and 123 along with proposed Non-disclosure Agreement under Protective Orderhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4913isonerdrnda.pdf
Responses (Public)4/9/2013Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-17 and 123 along with proposed Non-disclosure Agreement under Protective Orderhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4913isonerdrpb.pdf
Responses to Record Requests4/3/2013Counsel for NGRID files responses to: RR-EFSB-2, 21 to 24, and 32, and supplemental response to RR-EFSB-1, V-9 and V-10http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4313ngrsp.pdf
Responses to EFSB4/1/2013Counsel for NGRID files responses to: RR-EFSB-27 to 31 and 2nd supplemental response to EFSB-A-1http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/4113ngrsp.pdf
Responses3/29/2013Counsel for ISO-NE files responses to EFSB’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/32913isorsp.pdf
Ruling on ISO Moion for Confidentiality3/28/2013Presiding Officer issues Ruling on ISO-NE’s Motion for Confidential Treatmenthttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/32813efsbrul.pdf
Amended Response3/19/2013Counsel for ISO-NE files supplemental response to EFSB-ISO-85 as requestedhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31913isoamrsp.pdf
Email3/19/2013Presiding Officer requests ISO-NE to provide amended response to EFSB-ISO-85http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31913efsbeml.pdf
Ruling3/18/2013Presiding Officer grants NGRID's Motion for Protective Treatment of AG-1-1, AG-1-7, AG-1-10 and AG-1-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31813efsbrul.pdf
Cover Letter3/15/2013Counsel for ISO-NE files additional responses to First Set of Information Requests and files Motion for Confidential Treatment of some remaining responseshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31513isoadr1cl.pdf
Responses3/15/2013Counsel for ISO-NE files additional responses to First Set of Information Requests and files Motion for Confidential Treatment of some remaining responseshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31513isoadr1.pdf
Motion for Confidential Treatment3/15/2013Counsel for ISO-NE files additional responses to First Set of Information Requests and files Motion for Confidential Treatment of some remaining responseshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31513isoadr1mt.pdf
Responses to Record Requests3/13/2013Counsel for NGRID files record requests: RR-EFSB-14, 5, 6, 8 and 10 through 20http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31313ngrsprr.pdf
Responses3/12/2013Counsel for ISO-NE files responses to EFSB 2nd Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31213isorsp.pdf
Responses to Record Requests3/11/2013Counsel for NGRID files record requests: RR-EFSB-1, 3, 7 and 9http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31113ngrsp.pdf
ISO Responses (Public Redacted)3/8/2013Counsel for ISO-NE files confidential and redacted responses to EFSB’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/31213isorspn.pdf
Email Memo3/4/2013Presiding Officer notifies parties of a procedural conference on March 6thhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/3413efsbemem.pdf
Supplemental Response3/1/2013Counsel for NGRID files supplemental response to EFSB-A-1, and revised responses to EFSB-EMF-2 and 4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/3113ngsrsp.pdf
 2/27/2013Counsel for NGRID files confidential attachments to AG-1-1(a) (b) & (c), AG-1-7(a) & (b) and AG-1-10 (b) & ( c) 
Cover Letter2/27/2013Counsel for NGRID files confidential CLL Sensitivity Analysishttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22713ngcnfancl.pdf
Certificate of Service2/27/2013Counsel for NGRID files confidential CLL Sensitivity Analysishttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22713ngcnfancs.pdf
Affidavits2/26/2013Counsel for NGRID files affidavits of witnesses to responses of AG’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22613ngaff.pdf
Motion for Protective Order2/22/2013Counsel for NGRID files Motion for Protective Treatment of responses to: AG-1-1, AG-1-7, AG-1-10 and AG-1-14http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22213ngmtn.pdf
Cover Letter2/22/2013Counsel for NGRID files redacted responses to AG’s 1st Set of Information Requests, with CD of public responses to AG’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/22213ngrspcl.pdf
 2/22/2013Counsel for NGRID files confidential attachments to: AG-1-10(a), AG-1-23 and AG-1-24, with CD of CEII responses to AG’s 1st Set of Information Requests 
Cover Letter2/19/2013Presiding Officer issues EFSB’s 2nd Set of Information Requests to ISO-NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21913efsbir2cl.pdf
Information Request2/19/2013Presiding Officer issues EFSB’s 2nd Set of Information Requests to ISO-NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21913efsbir2.pdf
Ruling on Motion2/12/2013Presiding Officer grants NGRID’s Motion for Extension to respond to AG’s Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21213efsbrul.pdf
Cover Letter2/12/2013Counsel for NGRID files Motion for Extension of Time to respond to AG’s Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21213ngmtexcl.pdf
Certificate of Service2/12/2013Counsel for NGRID files Motion for Extension of Time to respond to AG’s Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21213ngmtexcs.pdf
Motion for Extension2/12/2013Counsel for NGRID files Motion for Extension of Time to respond to AG’s Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/21213ngmtex.pdf
Supplemental Responses2/6/2013Counsel for NGRID files redacted response to EFSB-PA-33(a), supplemental responses to EFSB-Z-13 and EFSB-V-15, revised response to EFSB-Z-14, and affidavits of responding witnesses to EFSB’s 3rd Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/2613ngsrsp.pdf
Email2/5/2013Presiding Officer forwards proposed dates for evidentiary hearings to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/2513efsbeml.pdf
Responses (Public)2/1/2013Counsel for ISO-NE files confidential responses to EFSB’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/2113isorsp1.pdf
 2/1/2013Counsel for ISO-NE files redacted responses to EFSB’s 1st Set of Information Requests 
Information Request1/24/2013Counsel for AG files 1st Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12413agir1.pdf
Responses1/24/2013Counsel for NGRID files confidential and redacted responses to EFSB’s 3rd Set of Information Requests, and revised response to EFSB-V-12http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12413ngrsp.pdf
Attachment to EFSB-PA-331/24/2013Counsel for NGRID files confidential and redacted responses to EFSB’s 3rd Set of Information Requests, and revised response to EFSB-V-12http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12413ngrspat.pdf
ISO-NE Responses1/18/2013Counsel for ISO-NE files additional responses to EFSB’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11813isorsp.pdf
ISO's Redacted Responses1/11/2013Counsel for ISO-NE files confidential and redacted responses to EFSB’s 1st Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11113isordrsp.pdf
Cover Letter1/10/2013Counsel for NGRID files revised response to EFSB-C-1http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11013ngrvrc-1cl.pdf
Revised Response to EFSB-C-11/10/2013Counsel for NGRID files revised response to EFSB-C-1http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11013ngrvrc-1.pdf
Certificate of Service1/10/2013Counsel for NGRID files revised response to EFSB-C-1http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11013ngrvrc-1cs.pdf
Cover Letter1/9/2013Counsel for NGRID files revised response to EFSB-NO-11http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/1913ngr11cl.pdf
Certificate of Service1/9/2013Counsel for NGRID files revised response to EFSB-NO-11http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/1913ngr11cs.pdf
Response to EFSB-NO-11 (Revised)1/9/2013Counsel for NGRID files revised response to EFSB-NO-11http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/1913ngr11.pdf
 1/8/2013Counsel for NGRID files responses to EFSB-PA-2 and PA-3 
Cover Letter1/2/2013Presiding Officer forwards EFSB 3rd Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/1213efsbir3cl.pdf
EFSB's 3rd set of IR1/2/2013Presiding Officer forwards EFSB 3rd Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/1213efsbir3.pdf
 12/21/2012Counsel for ISO-NE files responses to EFSB's 1st Set of Information Requests 
Cover Letter12/20/2012Counsel for NGRID files attachment to EFSB-A-7, inadvertently omitted from 2nd Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/122012ngefsba-7cl.pdf
Certificate of Service12/20/2012Counsel for NGRID files attachment to EFSB-A-7, inadvertently omitted from 2nd Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/122012ngefsba-7cs.pdf
Attachment to EFSB-A-712/20/2012Counsel for NGRID files attachment to EFSB-A-7, inadvertently omitted from 2nd Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/122012ngefsba-7.pdf
Email12/14/2012Presiding Officer advises parties of changes to procedural schedule regarding information requests and responseshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/121412efsblt.pdf
EFSB-ISO IR Responses 113 - 116 Public12/14/2012Counsel for ISO-NE files confidential and redacted responses to EFSB-ISO-113 to 116http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/121412isorsp.pdf
ISO-NE Letter to EFSB12/12/2012Counsel for ISO-NE files response to Presiding Officer regarding the expected filing timeline for ISO’s responses to Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/121212isolt.pdf
Letter Concerning the ICF Updating Issues12/12/2012Presiding Officer withdraws Dec. 3rd request to NGRID for updates in ICF model, withdraws information requests EFSB-PA-2(a) and PA-4, requesting response only to EFSB-PA-3 at this timehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/121212efsblt.pdf
 12/10/2012Counsel for NGRID files revised (redacted) responses to: EFSB-N-36, 37, 38, 79, 80, 82, 83 and 84 
Revised Responses - Public Version12/10/2012Counsel for NGRID files revised (CEII) responses to: EFSB-N-36, 37, 38, 79, 80, 82, 83 and 84http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/121012ngrvrsp.pdf
Cover Letter12/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpacl.pdf
Certificate of Service12/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpacs.pdf
Response to EFSB-PA-1712/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpa-17.pdf
Response to EFSB-PA-1812/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpa-18.pdf
Attachment to EFSB-PA-18 A12/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpa-18a.pdf
Attachment to EFSB-PA-18 B12/7/2012Counsel for NGRID files responses to EFSB-PA-17 and PA-18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12712ngrpa-18b.pdf
ICF Letter12/3/2012Presiding Officer requests that NGRID update the assumptions in ICF model to reflect ISO-NE 2012 updateshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/12312efsbicflt.pdf
Ruling11/29/2012Presiding Officer issues Ruling on NGRID’s Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112912efsbrul.pdf
Affidavits11/27/2012Counsel for NGRID files Affidavits of responsible witnesses for responses to EFSB’s Second Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112712ngaffd.pdf
EFSB-ISO IR Responses11/26/2012Counsel for ISO-NE files redacted responses to EFSB’s First Set of Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612isorsp.pdf
Cover Letter, COS, Motion,11/26/2012Counsel for NGRID files redacted responses to EFSB’s Second Set of Information Requests along with Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612ngrclrd.pdf
Cover Letter - Confidential11/26/2012Counsel for NGRID files redacted responses to EFSB’s Second Set of Information Requests along with Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612ngrclf.pdf
Responses11/26/2012Counsel for NGRID files redacted responses to EFSB’s Second Set of Information Requests along with Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612ngrsp1.pdf
Responses11/26/2012Counsel for NGRID files redacted responses to EFSB’s Second Set of Information Requests along with Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612ngrsp2.pdf
Responses11/26/2012Counsel for NGRID files redacted responses to EFSB’s Second Set of Information Requests along with Motion for Confidential Treatment of EFSB-C-4http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112612ngrsp3.pdf
Ruling on Motion for Extension11/21/2012Presiding Officer issues Ruling on NGRID’s Motion for Extension File Responses to EFSB-PA-2, 3, 4, 17 and 18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112112efsbrul.pdf
Cover Letter11/21/2012Counsel for NGRID files Motion for Extension of Time to File Responses to EFSB-PA-2, 3, 4, 17 and 18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112112ngmtcl.pdf
Motion11/21/2012Counsel for NGRID files Motion for Extension of Time to File Responses to EFSB-PA-2, 3, 4, 17 and 18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112112ngmtn.pdf
Certificate of Service11/21/2012Counsel for NGRID files Motion for Extension of Time to File Responses to EFSB-PA-2, 3, 4, 17 and 18http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/112112ngmtcs.pdf
Ground Rules11/6/2012Presiding Officer forwards Procedural Ground Rules to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11612efsbgrl.pdf
Cover Letter11/1/2012Presiding Officer issues First Set of Information Requests to ISO-NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112efsbir1cl.pdf
1st set of Information Requests to ISO-NE11/1/2012Presiding Officer issues First Set of Information Requests to ISO-NEhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112efsbir1.pdf
Cover Letter11/1/2012Presiding Officer issues Second Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112efsbircl.pdf
EFSB's 2nd set of IR11/1/2012Presiding Officer issues Second Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112efsbirq.pdf
Direct Testimony11/1/2012Counsel for NGRID files direct testimony of William Bailey, David Beron, James Durand, Gabriel Gabremicael, Robert Longden, Diedre Matthews, Daniel McIntyre, Judah Rose, Mark Stevens and Erin Whoriskeyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112ngdrtst.pdf
Direct Testimony11/1/2012Counsel for ISO-NE files direct testimony of Stephen Rourke and Brent Oberlinhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/11112isodtst.pdf
 10/24/2012Transcript of Oct 11th procedural conference received from Farmer Arsenault Brock (FAB) 
Cover Letter10/24/2012Counsel for NGRID files DEP Water Quality Certification and Section 61 Findinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/102412ngwqrcl.pdf
IRP Water Quality Certification10/24/2012Counsel for NGRID files DEP Water Quality Certification and Section 61 Findinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/102412ngwqr.pdf
Certificate of Service10/24/2012Counsel for NGRID files DEP Water Quality Certification and Section 61 Findinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/102412ngwqrcs.pdf
Ruling on Procedural Schedule10/12/2012Presiding Officer issues Ruling on Procedural Schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/101212efsbrul.pdf
Cover Letter10/10/2012Counsel for NGRID files suggested revisions to draft Procedural Schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/coverletter.pdf
Certificate of Service10/10/2012Counsel for NGRID files suggested revisions to draft Procedural Schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/certofservice.pdf
Draft Procedural Schedule10/10/2012Counsel for NGRID files suggested revisions to draft Procedural Schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/draftprocsched.pdf
Draft Procedural Schedule10/5/2012Presiding Officer forwards draft Procedural Schedule to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10512efsbdpsh.pdf
Procedural Ground Rules10/5/2012Presiding Officer forwards draft Procedural Schedule to partieshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10512efsbdgr.pdf
Cover Letter10/5/2012Counsel for NGRID files attachment to EFSB-N-12, omitted from previous filinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10512ngatn-12cl.pdf
Certificate of Service10/5/2012Counsel for NGRID files attachment to EFSB-N-12, omitted from previous filinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10512ngatn-12cs.pdf
Attachment to EFSB-N-1210/5/2012Counsel for NGRID files attachment to EFSB-N-12, omitted from previous filinghttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10512ngatn-12.pdf
Cover Letter10/3/2012Counsel for NGRID files SEIR, EEA certificate and DEP letter stating it has completed its review of the applicationhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10312ngseircl.pdf
Certificate of Service10/3/2012Counsel for NGRID files SEIR, EEA certificate and DEP letter stating it has completed its review of the applicationhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10312ngseircs.pdf
SEIR Certificate10/3/2012Counsel for NGRID files SEIR, EEA certificate and DEP letter stating it has completed its review of the applicationhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10312ngseirct.pdf
MA DEP Letter of Administrative Completeness10/3/2012Counsel for NGRID files SEIR, EEA certificate and DEP letter stating it has completed its review of the applicationhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/10312ngseircm.pdf
2012 Follow-Up Solution Study (PUBLIC)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapfs.pdf
Appendix A 1 (Public)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapa1.pdf
Appendix A 2 (Public)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapa2.pdf
Appendix A 3 (Public)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapa3.pdf
Appendix A 4 (Public)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapa4.pdf
Appendix A 5 (Public)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapa5.pdf
Cover Letter [PUBLIC]]9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapclp.pdf
Cover Letter [CEII]9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapclc.pdf
2012 Follow-up Needs Analysis (PUBLIC)9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfapfu.pdf
Section 2.0 Rev9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfaps2.pdf
Section 3.0 Rev9/28/2012Counsel for NGRID files confidential CEII version of Appendices 2-5 and 3-3 of IRP, and certain confidential CEII appendices of same on CDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92812ngcnfaps3.pdf
Ruling9/28/2012Presiding Officer issues Ruling on Petition for Confidential Treatmenthttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92212efsbrul.pdf
Ruling on Intervention9/25/2012Presiding Officer issues Ruling on interventionhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/92512efsbrul.pdf
Revised Proposed Procedural Schedule9/19/2012Counsel for NGRID files revised draft procedural schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91912ngrvpsc.pdf
Confidential Cover Letter9/18/2012Counsel for NGRID files confidential responses to certain EFSB Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91912ngrclf.pdf
Cover Letter9/18/2012Counsel for NGRID files remainder responses to EFSB Information Requests: EFSB-N-1 to 100 together with CD of samehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91812ngrefn1cl.pdf
Affidavit9/18/2012Counsel for NGRID files remainder responses to EFSB Information Requests: EFSB-N-1 to 100 together with CD of samehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91812ngrefn1afs.pdf
Affidavit9/18/2012Counsel for NGRID files remainder responses to EFSB Information Requests: EFSB-N-1 to 100 together with CD of samehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91812ngrefn1afg.pdf
Affidavit9/18/2012Counsel for NGRID files remainder responses to EFSB Information Requests: EFSB-N-1 to 100 together with CD of samehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91812ngrefn1afr.pdf
Affidavit9/18/2012Counsel for NGRID files remainder responses to EFSB Information Requests: EFSB-N-1 to 100 together with CD of samehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91812ngrefn1afsd.pdf
 9/13/2012Town of Franklin Administrator files letter of comment 
Cover Letter9/10/2012Pembroke Realty Trust re-files its Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91012prtptincl.pdf
Petition to Intervene9/10/2012Pembroke Realty Trust re-files its Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91012prtptin.pdf
Attachment9/10/2012Pembroke Realty Trust re-files its Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/91012prtptina.pdf
Response to Petitions to Intervene9/6/2012Counsel for NGRID files response to petitions to intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9612ngrptn.pdf
Ruling on Motion for Extension9/5/2012Presiding Officer issues ruling on NGRID’s Motion for Extension of Time to file responses to Information Requestshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/9512efsbrul.pdf
 9/4/2012Transcript of public hearing in Millford received from FAB 
Responses to Information Requests8/30/2012Counsel for NGRID files responses to EFSB Information Requests, CD of atts. to EFSB-G-1 and G-5, and a Request for Confidential Treatment of EFSB-LU-8http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/83012ngrsp.pdf
Motion for Extension Discovery8/29/2012Counsel for NGRID files Motion for Extension of Time to file IR responseshttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82912ngmtn.pdf
Petition to intervene8/29/2012ISO New England files Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82912isopt.pdf
 8/28/2012Presiding Officer forwards interested persons letter to pertinent town officials and adjudicatory list 
Letter re Proposed Filing Schedule8/28/2012 Counsel for NGRID advises Presiding Offficer that two ISO-NE reports will be issued in final form by mid-Septemberhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82812ngltps.pdf
 8/28/2012Siting Division Director forwards notification letter to Mass state senators and representatives 
Petiton to Intervene8/24/2012Pembroke Realty Trust files Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82412prtptn.pdf
Attachment8/24/2012Pembroke Realty Trust files Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82412prtpta.pdf
Excerpts from minutes of Nat Grid Meeting8/24/2012Pembroke Realty Trust files Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82412prtptex.pdf
 8/24/2012Transcript of Aug. 14th public hearing received from FAB 
Exhibit S of Application Analysis8/23/2012Counsel for NGRID files Exhibit 1 Attachment S to its Zoning Petitionhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82312ngex1.pdf
Letter re update to zoning filing8/23/2012Counsel for NGRID files Exhibit 1 Attachment S to its Zoning Petitionhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/82312ngexlt.pdf
 8/23/2012Karen Miller of Franklin files letter of comment 
Matthew Buskell's petition to intervene8/15/2012Matthew Buskell of Upton files petition to intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/81512mtbskpt.pdf
 8/14/2012Counsel for NGRID files Return of Service 
Cover Letter8/9/2012Presiding Officer issues First Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8912efsbir1cl.pdf
EFSB's 1st set of Information Requests8/9/2012Presiding Officer issues First Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8912efsbir1.pdf
Instructions8/9/2012Presiding Officer issues First Set of Information Requests to NGRIDhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/8912efsbir1in.pdf
Response to Presiding Officer7/27/2012Counsel for NGRID files response to Presiding Officer’s query whether NGRID would submit an amended Petition, and files appearance of additional counselhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/72712ngrsp.pdf
Appearance of Counsel - Lauren Peloquin7/27/2012Counsel for NGRID files response to Presiding Officer’s query whether NGRID would submit an amended Petition, and files appearance of additional counselhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/72712ngrspap.pdf
EFSB's update letter7/19/2012Presiding Officer requests NGRID to advise whether it will submit an amended Petition to reflect upgrades to its June 21st petitionhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71912efsbuplt.pdf
Hearing Notice7/17/2012Presiding Officer forwards Notice of Adjudication and Public Comment Hearing to counsel for Petitioner for publication and service on abutting property ownershttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71712efsbnth.pdf
Please Read7/17/2012Presiding Officer forwards Notice of Adjudication and Public Comment Hearing to counsel for Petitioner for publication and service on abutting property ownershttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71712efsbntpr.pdf
Notice of Hearing w signature7/17/2012Presiding Officer forwards Notice of Adjudication and Public Comment Hearing to counsel for Petitioner for publication and service on abutting property ownershttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71712efsbntsg.pdf
Notice7/11/2012Presiding Officer advises parties that the July 9th ISO-NE report and appendices are CEII material, and require clearance to be viewed at the ISO-NE websitehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71112efsbnt.pdf
Petition to Intervene7/11/2012Mass Attorney General files Petition to Intervenehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/71112agptint.pdf
 7/10/2012Presiding Officer advises counsel for NGRID of intervention deadline in EFSB regulations 
Proposed Procedural Schedule7/2/2012Counsel for NGRID files draft procedural schedulehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/7212ngpsc.pdf
 6/29/2012Counsel for NGRID files confidential CDs 
 6/27/2012Presiding Officer requests a proposed procedual schedule from NGRID 
Referral and Consolidation Order6/27/2012DPU Chair assigns and consolidates DPU 12-46/12-47 with EFSB 12-1http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62712efsbord.pdf
Ruling on motion for confidential treatment6/27/2012Presiding Officer issues Ruling on Motion for Confidential Treatmenthttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62712efsbrul.pdf
Attachment - NESCOE Criteria Discussion6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat15.pdf
Attachment - PP3 Reliability Standards6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat16.pdf
Attachment - NPCC Directory #16/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat17.pdf
Attachment - TPL-001-0.1 to TPL-004-06/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat18.pdf
Attachment - May 4, 2012 Letter6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat19.pdf
Attachment - Expanded Env Notification Form6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat8.pdf
Attachment - Current Status of Research6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat9.pdf
Attachment - Modeling of Cross Sections in Ma6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat10.pdf
Attachment - Memorandum of Agreement6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat11.pdf
Attachment - Policy on the Accommodation6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat12.pdf
Attachment - Assessment (Redacted)6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat13.pdf
Attachment - Proposed Site Plan6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat2.pdf
Attachment - Section 5 Figures6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat3.pdf
Attachment - Interstate Reliability Project6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat4.pdf
Attachment - Millbury #3 to West Farnum6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat5.pdf
Attachment - Map Project Alignment6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat6.pdf
Attachment - Map East West6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat7.pdf
EENF Appendix C6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnapc.pdf
EENF Appendix D6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnapd.pdf
EENF Appendix E6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnape.pdf
EENF Appendix F6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnapf.pdf
Draft Hearing Notice6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptndhn.pdf
Attachment - Draft Progress Print6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat1.pdf
Cover Letter6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptncl.pdf
Cover Letter - Confidential6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnclf.pdf
Motion for Confidential Treatment6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnmt.pdf
Notices of Appearance6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnntap.pdf
EENF Appendix B6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnapb.pdf
Motion for Consolidation6/21/2012New England Power Company d/b/a NGRID files Motion for Consolidation of its Interstate Reliability Project (IRP) petitions: EFSB 12-1 and DPU 12-46 and 12-47http://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112negmtcnf.pdf
Motion for Confidential Treatment6/21/2012New England Power Company d/b/a NGRID files Petition for Protective Order of certain CEII material included in appendices to its EFSB petitionhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112negptpord.pdf
Checklist for Zoning Exemption Petition6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspch.pdf
DPU Motion to Consolidate - section 72 and zoning6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspmt.pdf
Notices of Appearance6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspnt.pdf
Sec 72 petition6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptsp72.pdf
Exhibit M of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex19.pdf
Exhibit N of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex20.pdf
Exhibit O of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex21.pdf
Exhibit P of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex22.pdf
Exhibit Q of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex23.pdf
Exhibit R of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex24.pdf
Exhibit H (b) of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex13.pdf
Exhibit I of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex14.pdf
Exhibit J of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex15.pdf
Exhibit K of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex16.pdf
Exhibit L (a) of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex17.pdf
Exhibit L (b) of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex18.pdf
Exhibit D - Section 726/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex7.pdf
Exhibit D of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex8.pdf
Exhibit E of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex9.pdf
Exhibit F of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex10.pdf
Exhibit G of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex11.pdf
Exhibit H (a) of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex12.pdf
Exhibit A - Section 72 checklist6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex1.pdf
Exhibit A of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex2.pdf
Exhibit B - Section 726/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex3.pdf
Exhibit B of Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex4.pdf
Exhibit C - Section 726/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex5.pdf
Exhibit C of the Application Analysis6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex6.pdf
Cover Letter6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspcl.pdf
Petition6/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptsp.pdf
Exhibit 16/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex1a.pdf
Exhibit 26/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex2a.pdf
Exhibit 36/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex3a.pdf
Exhibit 46/21/2012New England Power Company d/b/a NGRID files petition for specific and comprehensive exemptions from zoning by-laws, and a petition for approval of the project’s transmission line, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millville, pursuant to G.L. c.40A, '3 and G.L. c.164, '72, respectivelyhttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptspex4a.pdf
Petition for Approval6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptn.pdf
Attachment - September 24, 2008 Letter6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat20.pdf
Attachment - Updated Solution Study Report6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat21.pdf
Attachment - Updated Needs Assessment (Redacted)6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat22.pdf
Attachment - Solutions Report6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat23.pdf
Attachment - Report 2 Options Analysis (Redacted)6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat24.pdf
Attachment - Report 1 Needs Analysis (Redacted)6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat25.pdf
Attachment - Assessment (Redacted)6/21/2012New England Power Company d/b/a NGRID files petition to construct & operate a new overhead 345-kV transmission line along the existing ROW, together with upgrades to an existing switching station, in the Towns of Millbury, Sutton, Northbridge, Uxbridge and Millvillehttp://www.env.state.ma.us/dpu/docs/siting/efsb12-1/dpu12-46/47/62112nepptnat14.pdf