Docket:
Docket Details
TypeDocketNameSubjectSummaryFiledClosedCategory
EFSBEFSB10-2ANSTAR ELECTRIC COMPANYNSTAR Electric Company files a project change filing related to proposed modifications to the design of the 345-kV transmission line, proposed changes to the height and location of other ancillary structures in the area of Plymouth Municipal Airport and the towns of Carver, Plymouth, Bourne and BarnstableProject Change9/14/2012  


Docket Electronic Filings
 DescriptionDateMemoURL
 12/4/2013Counsel for Attorney General files Withdrawal of Patrick Tarmey as counsel 
Letter1/3/2013Siting Division Director advises NSTAR to comply with FAA requirements and concludes that no further inquiry by the EFSB is necessary regarding the project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/1313efsblt.pdf
Responses to Siting Board12/21/2012Counsel for NSTAR files requested additional information relating to structures from Carver Substation and requests EFSB to approve additional changeshttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/122112nstrsp.pdf
Comments on Project Change12/19/2012Kerry LaLiberte files comments on project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/121912kllbcm.pdf
Certificate of Service12/19/2012Kerry LaLiberte files comments on project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/121912kllbcmcs.pdf
Letter re Questions12/14/2012Presiding Officer requests additional information from NSTAR relating to structures from Carver Substation to the State Forest Transition Stationhttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/121412efsbltrq.pdf
Letter to D Rosen11/15/2012Siting Division Director advises NSTAR that further review of the project change relating to the State Forest to Plymouth Station line segment is not necessaryhttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/111512efsbltr.pdf
NSTAR's Supplemental Materials11/13/2012Counsel for NSTAR files FAA’s determination of no hazard for structures 13A, 17A and 18Ahttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/111312nstsmt.pdf
NSTAR's Response11/9/2012Counsel for NSTAR files requested information relative to pole heights, visual impacts, location of structures, notification to residents, original design violations and alternatives NSTAR has considered to raising pole heightshttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/11912nstrsp.pdf
Requests for Additional Information11/5/2012Presiding Officer requests additional information from NSTAR with regard to the proposed project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/11512efsbrq.pdf
NSTAR's Comments11/2/2012Counsel for NSTAR forwards comments regarding the review process of its current project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/11212nstcmpg.pdf
Letter11/1/2012Presiding officer forwards letter to counsel for NSTAR regarding proposed project changehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/11112efsblt.pdf
Lower SEMA Construction Dates10/24/2012Counsel for NSTAR forwards expected construction start dates for the proposed project changeshttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/102412nstcnsd.pdf
PCF Supplement Filing10/18/2012Counsel for NSTAR files FAA’s determination of no hazard for structures 11-19, and a copy of NSTAR’s application to FAA for structures: 13A, 17A and 18Ahttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/102412nstsupfl.pdf
PCF Supplement10/17/2012Counsel for NSTAR files an updated redesign of structures 11 through 19 in the form of a Project Change Supplementhttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/101712nstpcfsp.pdf
NSTAR Electric Lower SEMA Supplemental Filing9/24/2012Counsel for NSTAR files completed MOA to be inserted as Att. 4, Section 6 of Project Change Filinghttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/92412nstspfl.pdf
Project Change filing9/14/2012NSTAR Electric Company files a project change filing related to proposed modifications to the design of the 345-kV transmission line, proposed changes to the height and location of other ancillary structures in the area of Plymouth Municipal Airport and the towns of Carver, Plymouth, Bourne and Barnstablehttp://www.env.state.ma.us/dpu/docs/siting/efsb10-2a/91412nstcmpfl.pdf