ELECTRIC13-119Fitchburg Gas & Electric Light Co. d/b/a UnitilPetition of Fitchburg Gas and Electric Company d/b/a Unitil to the Department of Public Utilities for review and approval of its 2012 Annual Energy Efficiency Report (Electric).2012 EE Annual Report8/1/2013  


Docket Electronic Filings
 DescriptionDateMemoURL
 3/31/2014Reply Brief of the Commonwealth of Massachusetts Department of Energy Resources. By Steven Venezia. DPU 12-51 thru 12-61; 13-110 thru 13-122 
 3/31/2014Joint Reply Brief of the Program Administrators. By Shaela McNulty Collins. DPU 12-51 thru 12-61; 13-110 thru 13-122 
 3/31/2014Reply Brief on behalf of the Attorney General. By Matthew Saunders. DPU 12-51 thru 12-61; 13-110 thru 13-122 
 3/28/2014Reply Brief of the Low-Income Weatherization and Fuel Assistance Program Network. By Jerrold Oppenheim. DPU 12-51 thru 12-61; 13-110 thru 13-122 
Initial Brief3/20/2014Initial Brief of Fitchburg Gas and Electric Light Company d/b/a Unitil. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Brief-10276.pdf
 3/19/2014Initial Brief of the Commonwealth of Massachusetts Department of Energy Resources. By Steven Venezia. DPU 12-51 thru 12-61; 13-110 thru 13-122 
 3/19/2014Initial Brief on behalf of the Attorney General. By Matthew Saunders. DPU 12-51 thru 12-61; 13-110 thru 13-122 
 3/14/2014TRANSCRIPT - Hearing held at the Department of Public Utilities, One South Station, Boston, MA, on Tuesday, March 4, 2014 at 1:38 p.m. Vol. 1, pages 1-70. DPU 12-58; 13-119 
 3/7/2014Response of Fitchburg Gas and Electric Light Company d/b/a Unitil to record request RR-DPU-1 from the March 4, 2014 evidentiary hearing. By Kevin Penders. DPU 12-58; 13-119 
Letter re Evidentiary Hearing2/28/2014Letter of notice on behalf of the Attorney General’s Office that it does not require evidentiary hearings in these procedings. By Matthew Saunders. DPU 12-51 through DPU 12-61; DPU 13-110 through DPU 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/22114agltr.pdf
 2/27/2014Revised responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General’s third common set of information requests. By Kevin Penders. DPU 12-58/13-119 
Responses2/26/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to various information requests from the Department’s fifth set in the Company’s electric annual report dockets. DPU-5-1 DPU-5-9; DPU-5-10; DPU-5-1; DPU-5-12; DPU-5-13; DPU-5-14; DPU-5-15; DPU-5-16; DPU-5-17; DPU-5-18; DPU-5-19; DPU-5-20; DPU-5-21; DPU-5-22; DPU-5-23; DPU-5-24; DPU-5-25; DPU-5-26; DPU-5-27; DPU-5-28; DPU-5-29; DPU-5-31; DPU-5-32; DPU-5-33; DPU-5-34; DPU-5-35; DPU-5-36; DPU-5-37; DPU-5-38; DPU-5-39; DPU-5-40; DPU-5-41; DPU-5-42; DPU-5-43; DPU-5-44; DPU-5-46; DPU-5-47; DPU-5-50; DPU-5-51; DPU-5-52; DPU-5-53; DPU-5-57; DPU-5-58. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Responses-9336.pdf
Responses2/25/2014Remaining responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to various information requests from the Department’s Fifth Set. By Kevin penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Responses-9614.pdf
Revised Responses2/24/2014Hearing Officer Memorandum setting forth the schedules for evidentiary hearings in the electric energy efficiency annual report proceedings. By Jeffrey Leupold and Clayton Hale, Hearing Officers. DPU 12-54; 12-55; 12-57; 12-58; 12-60; 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-9956.pdf
Attachment to AG-Comm-3-12/24/2014Hearing Officer Memorandum setting forth the schedules for evidentiary hearings in the electric energy efficiency annual report proceedings. By Jeffrey Leupold and Clayton Hale, Hearing Officers. DPU 12-54; 12-55; 12-57; 12-58; 12-60; 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-9957.xlsx
Attachment to AG-Comm-3-22/24/2014Hearing Officer Memorandum setting forth the schedules for evidentiary hearings in the electric energy efficiency annual report proceedings. By Jeffrey Leupold and Clayton Hale, Hearing Officers. DPU 12-54; 12-55; 12-57; 12-58; 12-60; 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-9958.xlsx
Responses to AG Common Set 32/20/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Office of the Attorney General’s Third Set of Common Information Requests. By Kevin Penders. DPU 12-58/13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/21914fgerspag3.pdf
Attachment AG-Comm-3-12/20/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Office of the Attorney General’s Third Set of Common Information Requests. By Kevin Penders. DPU 12-58/13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/21914fgerspag3-1a.xlsx
Attachment AG-Comm-3-22/20/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Office of the Attorney General’s Third Set of Common Information Requests. By Kevin Penders. DPU 12-58/13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/21914fgerspag3-2a.xlsx
Responses to DOER's 5th set of IR2/20/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Energy Resources’ Fifth Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/21914fgerspdoer5.pdf
Responses to DPU2/20/2014Responses of Fitchburg Gas and Electric Company d/b/a Unitil to the Department’s Fourth Set of Information Requests By Kevin Penders, DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-9172.pdf
Responses2/18/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's Third Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-9103.pdf
Responses2/11/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s Second Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-8906.pdf
Withdrawal of Motion to Extend2/10/2014Notice of Withderawal of the Program Administrators' Joint Motion for Extension of the Deadline to File Responses to the Attorney General's Second Set of Information Requests submitted on February 3, 2014. DPU 12-51 through 12-53; 12-55 through 12-61; 13-112 through 13-117; 13-119 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/21014prgltwd.pdf
Information Request2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8706.pdf
IR 5 Table 1 - EM&V Studies2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8707.xlsx
IR 5 Table 1 End-Uses2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8708.xlsx
IR 5 Table 1 Performance Metrics2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8709.xlsx
IR-5 Tables Appliances Program2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8710.xlsx
IR-5 Tables COOL Smart2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8711.xlsx
IR-5 Tables Low Income New Construction2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8712.xlsx
IR-5 Tables Low Income Retrofit2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8713.xlsx
IR-5 Tables Multi Family Retrofit2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8714.xlsx
IR-5 Tables Residential New Construction2/5/2014Department’s Fifth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8715.xlsx
Information Request2/4/2014Office of the Attorney General’s Third Set of Common Information Requests, and notice of withdrawal of its Second Set of Common Information Requests. By Matthew Saunders. DPU 12-51 through 12-61; 13-110 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/2414agir3.pdf
Attachment2/4/2014Office of the Attorney General’s Third Set of Common Information Requests, and notice of withdrawal of its Second Set of Common Information Requests. By Matthew Saunders. DPU 12-51 through 12-61; 13-110 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/2414agir3a.xlsx
Cover Letter2/4/2014Department of Energy Resources' Fifth Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/2414doerir5cl.pdf
Information Request2/4/2014Department of Energy Resources' Fifth Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/2414doerir5.pdf
Certificate of Service2/4/2014Department of Energy Resources' Fifth Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/2414doerir5cs.pdf
Information Request2/4/2014Department’s Fourth Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8650.pdf
Cover Letter2/3/2014Joint Motion of the Program Administrators for Extension of the Deadline to File Responses to Information Requests for 2011 and 2012 Energy Efficiency Annual Reports. By Jodi Hanover. DPU 12-51 through 12-53; DPU 12-55 through 12-61; DPU 13-112 through 13-117; DPU 13-119 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/2314pradmtcl.pdf
Motion2/3/2014Joint Motion of the Program Administrators for Extension of the Deadline to File Responses to Information Requests for 2011 and 2012 Energy Efficiency Annual Reports. By Jodi Hanover. DPU 12-51 through 12-53; DPU 12-55 through 12-61; DPU 13-112 through 13-117; DPU 13-119 through 13-122http://www.env.state.ma.us/dpu/docs/electric/13-119/2314pradmtn.pdf
IR-3Tables1/31/2014Department’s Third Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8609.xlsx
Information Request1/31/2014Department’s Third Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8610.pdf
IR-1 Tables HES Program1/31/2014Remaining Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8625.xlsx
Responses1/31/2014Remaining Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-8626.pdf
Information Request1/28/2014Department’s Second Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8385.pdf
Attachment1/28/2014Department’s Second Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8386.xlsx
Responses1/28/2014Responses to Fitchburg Gas and Electric Light Company d/b/a Unitil to the Office of the Attorney General’s First Set of Common Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12714fgerag1.pdf
Responses1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-8434.pdf
IR-1 Tables Lighting Program1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8435.xlsx
IR-1 Tables C&I Small Retrofit1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8436.xlsx
IR-1 Tables C&I New Construction1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8437.xlsx
IR-1 Tables C&I Large Retrofit1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8438.xlsx
IR-1 Tables 2 and 4 HES1/27/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department’s First Set of Information Requests Motion for Extension of Time to file the Company’s responses to Information Requests DPU-1-14 and DPU-1-16. By Kevin Penders. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Filing-8439.xlsx
Cover Letter1/17/2014Department of Energy Resources' Third Set of Common Information and Document Requests to Electric Program Administrators. By Steven I. Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/11714doerir3cl.pdf
DOER's 3rd set of IR1/17/2014Department of Energy Resources' Third Set of Common Information and Document Requests to Electric Program Administrators. By Steven I. Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/11714doerir3.pdf
Certificate of Service1/17/2014Department of Energy Resources' Third Set of Common Information and Document Requests to Electric Program Administrators. By Steven I. Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/11714doerir3cs.pdf
Information Request1/17/2014Office of the Attorney General’s Second Set of Common Information Requests. By Matthew Saunders. DPU 12-51 through 12-61; 13-110 through 13-122http://www.env.state.ma.us/dpu/docs/gas/13-110/11714agir2.pdf
Responses1/14/2014Responses of Fitchburg Gas and electric Light Company d/b/a Unitil to the Department of Energy Resources' First Set of Information Requests to the Company. By Kevin Penders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/13-119-Response-7880.pdf
Information Request1/10/2014Office of the Attorney General’s First Set of Common Information Requests. By Matthew Saunders. DPU 12-51 through 12-61; 13-110 through 13-122http://www.env.state.ma.us/dpu/docs/gas/13-110/11014agir1.pdf
Responses1/9/2014Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Energy Resources’ First Set of Information Requests. By Kevin Penders. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/1914doerrspdr1.pdf
IR-1 Tables Lighting Program1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7655.xlsx
Information Request1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7656.pdf
IR-1 Tables C&I Large Retrofit1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7657.xlsx
IR-1 Tables C&I New Construction1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7658.xlsx
IR-1 Tables C&I Small Retrofit1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7659.xlsx
IR-1 Tables HES Program1/8/2014Department’s First Set of Information Requests to Unitil. By Jeffrey Leupold, Hearing Officer. DPU 12-58; 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Filing-7660.xlsx
Cover Letter12/27/2013Department of Energy Resources' First Set of Common Information and Document Requests for Unitil Electric. By Steven Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/122713doerir1cl.pdf
Information Request12/27/2013Department of Energy Resources' First Set of Common Information and Document Requests for Unitil Electric. By Steven Venezia. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/122713doerir1.pdf
Cover Letter12/23/2013Department of Energy Resources' First Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/12-54/122413doerir1cl.pdf
Certificate of Service12/23/2013Department of Energy Resources' First Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/12-54/122413doerir1cs.pdf
Information Request12/23/2013Department of Energy Resources' First Set of Common Information and Document Requests to Electric Program Administrators. By Steven Venezia. DPU 13-118 through 13-122http://www.env.state.ma.us/dpu/docs/electric/12-54/122413doerir1.pdf
Procedural Schedule11/19/2013Procedural Schedule and Ground Rules. By Jeffrey Leupold, Hearing Officer. DPU 12-58 and 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Schedule-6051.pdf
 11/15/2013TRANSCRIPT - Hearing and Procedural Conference held at the Department of Public Utilities, One South Station, Boston, MA, on Wednesday, November 6, 2013 at 2 p.m. Pages 1-11. DPU 13-113 through DPU 13-122 
Return of Service10/30/2013Return of Service on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil. By Gary Epler. DPU 12-58, DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/102913fgertsv.pdf
Petition to Intervene10/30/2013Petition to Intervene of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 13-119http://www.env.state.ma.us/dpu/docs/gas/13-110/103013liwpt.pdf
Change in Address10/15/2013Notice of change of address by Andrew Newman. DPU 13-111 through 13-122http://www.env.state.ma.us/dpu/docs/gas/13-111/101513anchad.pdf
Cover Letter10/10/2013Petition to Intervene on behalf of the Department of Energy Resources. By Steven Venezia. DPU 13-111 through 13-122http://www.env.state.ma.us/dpu/docs/gas/13-111/101113doerptincl.pdf
DOER's Petition to Intervene10/10/2013Petition to Intervene on behalf of the Department of Energy Resources. By Steven Venezia. DPU 13-111 through 13-122http://www.env.state.ma.us/dpu/docs/gas/13-111/101113doerptin.pdf
Notice of Filing10/4/2013Order of Notice; Notice of Filing and Public Hearing. Hearing to be held on November 6, 2013 at 2:00 p.m., at the Department's offices, One South Station, Boston, MA. By Mark D. Marini, Secretary. DPU 12-58/13-119http://www.env.state.ma.us/dpu/docs/electric/12-58/12-58-Notice-4963.pdf
 8/27/2013Assignment to Hearing Officer, Jeffrey Leupold. By Chair Berwick and Commissioner Westbrook. DPU 13-119 
Notice of Intervention and Appearance8/14/2013Attorney General’s Notice of Intervention and Appearance of Counsel. By Matthew Saunders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/81513agntint.pdf
Initial Filing8/2/2013Fitchburg Gas and Electric Light Company d/b/a Unitil submits its 2012 Annual Energy Efficiency Report (Electric Division), and Appearance of Counsel by Kevin Penders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/8213fgeptn.pdf
Appendix B18/2/2013Fitchburg Gas and Electric Light Company d/b/a Unitil submits its 2012 Annual Energy Efficiency Report (Electric Division), and Appearance of Counsel by Kevin Penders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/8213fgeptnapb1.xlsx
Appendix B28/2/2013Fitchburg Gas and Electric Light Company d/b/a Unitil submits its 2012 Annual Energy Efficiency Report (Electric Division), and Appearance of Counsel by Kevin Penders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/8213fgeptnapb2.xlsx
Attachment8/2/2013Fitchburg Gas and Electric Light Company d/b/a Unitil submits its 2012 Annual Energy Efficiency Report (Electric Division), and Appearance of Counsel by Kevin Penders. DPU 13-119http://www.env.state.ma.us/dpu/docs/electric/13-119/8213fgeptnat.xlsx





Docket Service List
FirstLastCompanyAddressCityStateZipEmailFAXPhone
JerroldOppenheim, Esq.Democracy and Regulation57 Middle StreetGloucesterMA01930JerroldOpp@Yahoo.com978-283-0957978-283-0897
StevenVenezia, Esq.Department of Energy Resources100 Cambridge Street, Suite 1020BostonMA02114steven.venezia@state.ma.us617-727-0030617-727-4732
KevinPenders, Esq.Keegan Werlin LLP265 Franklin Street, 6th FloorBostonMA02110kpenders@keeganwerlin.com617-951-1354617-951-1400
MatthewSaunders, Esq.Office of the Attorney GeneralOne Ashburton PlaceBostonMA02108Matthew.Saunders@state.ma.us 617-727-2200