Docket:
Docket Details
TypeDocketNameSubjectSummaryFiledClosedCategory
ELECTRIC11-129MASSACHUSETTS ELECTRIC COMPANYPetition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program.2012 SMART GRID12/23/2011  


Docket Electronic Filings
 DescriptionDateMemoURL
Appearance of Counsel1/7/2014Appearance of Counsel of Melissa Liazos on behalf of Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Appearance-7627.pdf
Appearance of Counsel12/23/2013Appearance of Counsel on behalf of the Department of Energy Resources. By Michael Altieri. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Appearance-7343.pdf
Memorandum12/17/2013Hearing Officer Memorandum regarding Procedural/Technical Conference to be held on January 9, 2014. By Alan Topalian. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Filing-7623.pdf
Substitution of Counsel12/4/2013Attorney General’s Withdrawal of Counsel by Patrick Tarmey, and Appearance of Counsel by Jamie Tosches. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Filing-6796.pdf
 7/19/2013Hearing Officer's Certification of Record to Department Secretary. By Laura Bickel. DPU 11-129 
 7/19/2013Hearing Officer Memorandum to Department Secretary RE: Exhibits and Record Request for Public Record., along woth copies of Exhibits, & Record Request. By Laura Bickel. DPU 11-129. 
Appearance of Counsel9/4/2012Appearance of Counsel on behalf of the Department of Energy Resources. By Rachel Graham Evans. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/9412doerapcn.pdf
Notice of Withdrawal8/29/2012Notice of Withdrawal of Appearance of Counsel on behalf of Western Massachusetts Electric Company. By Donald Wells, Jr. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/82912wmntwd.pdf
Order8/3/2012ORDER. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/8312dpuord.pdf
Granted - Motion8/2/2012GRANTED - Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Filing-2844.pdf
Reply Brief by the Low-Income Network6/6/2012Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/6612liinbf.pdf
Reply Brief6/6/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Reply Briefs. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/6612ngrpb.pdf
Supplemental Response to RR-AG-136/1/2012Supplemental response of National Grid to RR-AG-13. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/6112nggrag-13.pdf
Cover Letter6/1/2012Supplemental response of National Grid to RR-AG-13. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/6112nggragcl.pdf
Cover Letter6/1/2012Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexcl.pdf
Exhibit AG-26/1/2012Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexag-2.pdf
Exhibit AG-36/1/2012Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexag-3.pdf
Supplement to Initial Brief5/30/2012Supplement to Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/53012lisib.pdf
Cover Letter5/30/2012Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcl.pdf
Initial Brief of the Attorney General5/30/2012Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbf.pdf
Cover Page5/30/2012Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcp.pdf
Certificate of Service5/30/2012Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcs.pdf
Cover Letter5/30/2012Initial Brief of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/53012nginbcl.pdf.pdf
Initial Brief5/30/2012Initial Brief of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/53012nginb.pdf
Cover Letter5/25/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmtcl.pdf
Exhibit List5/25/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmtex.pdf
Motion for Submit Evidence Into Record5/25/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmt.pdf
Omnibus Motion for Confidentiality5/25/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmto.pdf
Granted Motion5/24/2012GRANTED - Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By Marc Tassone (for Laura Bickel, Hearing Officer). DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/52412dpugrmt.pdf
Cover Letter5/23/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/52312ngmtexcl.pdf
Motion for Extension of Deadline5/23/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/52312ngmtex.pdf
Responses to AG First Set Discovery on RRs5/22/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1.pdf
AG-IR-RR-7 (Att 1) Two year pilot program5/22/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1a1.xlsx
AG-IR-RR-7 (Att 2) One year pilot program5/22/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1a2.xlsx
AG's 1st set of IR5/18/2012Attorney General's First Set of Document and Information Requests on Record Request Responses. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51812agir1.pdf
Initial Brief5/18/2012Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51812liinbf.pdf
Hearing Officer Ruling5/17/2012Hearing Officer Ruling on Attorney General's Motion for Leave to Conduct Discovery on Record Request Responses. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51712dpurul.pdf
Memorandum5/16/2012Memorandum re: Motions for Protective Treatment. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51712dpuhrul.pdf
Response to AG Proced Motion5/14/2012RESPONSE RR-DPU-16 of Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrag.pdf
Response to RR-DPU-165/14/2012RESPONSE RR-DPU-16 of Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrd-16.pdf
Appendix F5/14/2012RESPONSE RR-DPU-16 of Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrap.pdf
Cover Letter5/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrcl.pdf
Attachment to RR-AG-165/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag-16a.pdf
Responses to DPU RRs5/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrd.pdf
Responses to AG RRs5/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag.pdf
Responses to LIN RRs5/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrli.pdf
Response to RR-AG-165/14/2012RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag-16.pdf
 5/14/2012TRANSCRIPT - Public Hearing, held on Friday, May 4, 2012, at the Department of Public Utilities, One South Station, Boston. Vol. 4, Pages 627-813. DPU 11-129 
Cover Letter5/11/2012Opposition to Attorney General’s Motion for Leave to Conduct Discovery on Responses to Record Requests and for Amendment of the Procedural Schedule. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51112ngoppcl.pdf
Opposition to AG's Motion for Leave5/11/2012Opposition to Attorney General’s Motion for Leave to Conduct Discovery on Responses to Record Requests and for Amendment of the Procedural Schedule. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/51112ngopp.pdf
Memorandum5/9/2012Memorandum re: Responses to Attorney General's May 8, 2012 Motion. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/5912dpumem.pdf
Cover Letter5/7/2012Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtcl.pdf
Certificate of Service5/7/2012Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtcs.pdf
AG's Motion for Leave5/7/2012Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtn.pdf
 5/4/2012TRANSCRIPT - Continued Public Hearing held at the Department of Public Utilities, May 2, 2012. Vol. 2, Pages 182-425. 
 5/4/2012TRANSCRIPT - Continued Public Hearing, held at the Department of Public Utilities on Thursday, May 3, 2012. Vol. 3, Pages 426-626. DPU 11-129 
 5/4/2012TRANSCRIPT of Public Hearing held at the Department of Public Utilities, April 30, 2012. Vol. 1, Pages 1-181. 
Cover Letter4/30/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8cl.pdf
Response to DPU-8-8 [Supplemental])[REDACTED]4/30/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8-8.pdf
Motion for Confidentiality (DPU-8-8 Supplemetal)4/30/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8mt.pdf
Cover Letter4/27/2012REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvrcl.pdf
Response to DPU-NG-2-5 REVISED (Redacted)4/27/2012REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvr2-5.pdf
Attachment to AG-5-24-2 (Redacted)4/27/2012REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvr5-24a.pdf
Surrebuttal Testimony4/27/2012Surrebuttal Testimony of Barbara Alexander with Exhibit, on behalf of the Attorney General. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42712agst.pdf
ComEd CAP Final Analysis4/27/2012Surrebuttal Testimony of Barbara Alexander with Exhibit, on behalf of the Attorney General. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42712agsta.pdf
Cover Letter4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdcl.pdf
NGrid Responses to AG Set 5 (public)4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrag5.pdf
Response to DPU Set 5, [SUPPLEMENTAL 5-4]4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd5.pdf
Motion for Confidentiality4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdmt.pdf
Attachment to DPU-8-124/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-12a.xls
Attachment to DPU-8-134/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-13a.xls
Attachment to DPU-8-144/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-14a.xls
Attachment to DPU-8-154/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-15a.xls
Responses to DPU Set 9 (minus redacted 9-2(att)4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd9.pdf
Response to DPU Set 8 [PUBLIC]4/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8.pdf
Exhibit PTZ-54/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdex.pdf
Attachment to DPU-8-54/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-5a.xls
Attachment to DPU-8-64/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-6a.xls
Attachment to DPU-8-94/26/2012National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-9a.xls
Memorandum4/25/2012Hearing Officer Memorandum Re: Procedural Schedule. By Laura Bickel. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/42512dpumem.pdf
Motion for Protective Treatment4/18/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Motion for Protective Treatment associated with Information Request DPU-7-6. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41812ngmtpt.pdf
Rebuttal Testimony4/18/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Rebuttal Testimony. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41812ngrbts.pdf
Attachment to DPU-7-12-84/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a8.xls
Attachment to DPU-7-12-24/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a2.xls
Attachment to DPU-7-12-34/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a3.xlsx
Attachment to DPU-7-12-44/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a4.xls
Attachment to DPU-7-12-54/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a5.xls
Attachment to DPU-7-12-64/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a6.xls
Attachment to DPU-7-12-74/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a7.xls
Responses to DPU's 7th set of IR4/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7.pdf
Attachment to DPU-7-12-14/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a1.xls
NGRID Redacted Responses to AG Set 44/17/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit REDACTED responses to Information Requests: AG-4-12, AG-4-13, AG-4-22, AG-4-23, AG-4-24, AG-4-25, AG-4-26 and AG-4-30. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrag4.pdf
Motion for Confidentiality4/13/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Sixth Set of Information Requests. Confidential responses to DPU-6-2, 6-7 and 6-12, and confidential attachments DPU-6-15-1 and 6-15-2. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/41312ngrd6.pdf
Responses to DPU's 6th set of IR4/13/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Sixth Set of Information Requests. Confidential responses to DPU-6-2, 6-7 and 6-12, and confidential attachments DPU-6-15-1 and 6-15-2. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/41312ngrd6mt.pdf
DPU's 8th set of IR4/12/2012Department's Eighth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/41212dpuir8.pdf
DPU's 9th set of IR4/12/2012Department's Ninth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/41212dpuir9.pdf
AG's 5th set of IR4/12/2012Attorney General's Fifth Set of Information and Document Requests and Certificate of Service. By Patrick Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/41212agir5.pdf
Cover Letter4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litscl.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex5.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex6.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex7.pdf
Direct Testimony4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912lits.pdf
Affidavit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litsaf.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex1.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex2.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex3.pdf
Exhibit4/9/2012The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex4.pdf
Prepared Testimony4/9/2012Prepared Testimony of Barbara R. Alexander on behalf of the Attorney General. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4912agtst.pdf
Attachment to AG-4-1-34/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-3a.pdf
Attachment to AG-4-1-44/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-4a.pdf
Attachment to AG-4-1-54/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-5a.pdf
Attachment to AG-4-1-64/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-6a.pdf
NGrid Responses to AG Set 44/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4.pdf
Motion for Confidentiality (AG Set 4)4/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4mt.pdf
Attachment to AG-4-1-14/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-1a.pdf
Attachment to AG-4-1-24/6/2012Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-2a.pdf
 4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Eighth and Ninth Set of Information Requests and the Attorney General's Fifth Set of Information Request Along with Motion for Protective Treatment. Lastly, the National Grid is also Filing an Un-Redacted version of PTZ-5 which it had intended to file on February 13, 2012. By John K. Habib. DPU 11-129. 
DPU's 7th set of IR3/30/2012Department of Public Utilities Seventh Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/32912dpuir7.pdf
DPU's 6th set of IR3/29/2012Department of Public Utilities Sixth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/32912dpuir6.pdf
AG's 4th set of IR3/23/2012Attorney General submits Fourth Set of Information and Document Requests and Certificate of Service. By Patrick Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/32312agir4.pdf
Cover Letter3/20/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's redacted version of Attachment DPU-5-7. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/32012ngrdat5-7l.pdf
DPU-NG-5-7 (att) (REDACTED)3/20/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's redacted version of Attachment DPU-5-7. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/32012ngrdat5-7.pdf
Responses tp DPU's 5th set of IR3/19/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Fifth Set of Information Requests as noted on accompanying list. Along with a Motion for Protective Treatment. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrd5.pdf
Motion for Confidentiality (DPU Set 5)3/19/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Fifth Set of Information Requests as noted on accompanying list. Along with a Motion for Protective Treatment. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrd5mt.pdf
Responses to AG's 3rd set of IR3/19/2012Responses of National Grid to the Attorney General's Third Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrag3.pdf
Responses to LIN's 1st set of IR3/14/2012National Grid's Responses to the First Set of Information Requests of the Low-Income Weatherization and Fuel Assistance Program Network. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngrli.pdf
LIN-1-17-2 (REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-2.pdf
LIN-1-17-3(a)(REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-3a.pdf
LIN-1-17-3(b)(REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-3b.pdf
LIN-1-17-4 (a) (REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-4a.pdf
LIN-1-17-4 (b) (REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-4b.pdf
LIN-1-17-5 (REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-5.pdf
Cover Letter3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtcl.pdf
Motion for Confidentiality3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtn.pdf
LIN-1-17-1 (REDACTED)3/14/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-1.pdf
AG - Topics for Discussion in Tech Conf3/8/2012List of Additional Topics for Discussion for National Grid’s Smart Grid Information Technology Technical Conference. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3812aglist.pdf
NGrid Responses to AG Set 23/7/2012National Grid's responses to the Attorney General's Second Set of Information Requests. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3712ngrag2.pdf
Attachment to AG-2-153/7/2012National Grid's responses to the Attorney General's Second Set of Information Requests. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3712ngrag2a.xls
Memorandum3/6/2012Memorandum to Service List RE: Technical Conference on March 9, 2012. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/3612dpumem.pdf
Low Income Motion re Tech Session questions3/5/2012Motion of the Low-Income Weatherization and Fuel Assistance Program Network to allow Nancy Brockway to attend the Technical Conference as an expert witness. By Jerrold Oppenheim. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3512leanmt.pdf
AG's 3rd set of IR3/5/2012Attorney General's Third Set of Document and Information Requests. By Patrick J. Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3512agir3.pdf
DPU's 5th set of IR3/2/2012Department's Fifth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/3212dpuir5.pdf
Responses to DPU's 4th set of IR2/29/2012Responses of National Grid to the Department's Fourth Set of Information Requests. By John Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22912ngrd4.pdf
Cover Letter2/27/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3cl.pdf
Company Responses to DPU 2-2, 2-4 thru 2-72/27/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3.pdf
Responses to DPU's 3rd set of IR2/27/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd2.pdf
DPU-NG-3-6-2 SmartGrid Price Elasticity2/27/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3-6a.xls
Low Income Data Requests,Set 12/27/2012First Set of Data Requests of the Low-Income Weatherization and Fuel Assistance Program Network. By Jerrold Oppenheim. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22712leandtrq.pdf
Motion for Confidentiality2/27/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in its response to DPU-2-5. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngmtn.pdf
Motion for Protective Treatment2/22/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in Attachment AG-1-50(a). By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngmtn.pdf
Responses to DPU Set 2 (minus 2-2, 2-4 thru 2-7)2/22/2012National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrd2.pdf
Cover Letter2/22/2012National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrag1cl.pdf
Responses to AG Set 12/22/2012National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrag1.pdf
Schedule, Service List, and Ground Rules2/22/2012Procedural Schedule, Service List, and Ground Rules. By Laura Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212dpupsc.pdf
Stamp-Approval Extension2/22/2012GRANTED - Motion of National Grid for an Extension of Deadline to File Responses to the Department of Public Utilities' Information Requests. By Laura Bickel. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/22212dpugrmt.pdf
AG's 2nd set of IR2/21/2012Attorney General's Second Set of Document and Information Requests to Massachusetts Electric Co. and Nantucket Electric Co. d/b/a National Grid. By Patrick Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/22112agir2.pdf
 2/17/2012TRANSCRIPT - Public Hearing, held on Thursday, February 9, 2012 at 2 p.m., at the Department of Public Utilities. Vol. A, pages 1-11. DPU 11-129 
Motion for Extension of Deadline2/17/2012Motion of National Grid for an Extension of Deadline to File Responses to the Department of Public Utilities' Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21712ngmtex.pdf
Cover Letter2/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1cl.pdf
Response to DPU-NG-1-12/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-1.pdf
Response to DPU-NG-1-22/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-2.pdf
Response to DPU-NG-1-32/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-3.pdf
Response to DPU-NG-1-42/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-4.pdf
Response to DPU-NG-1-52/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-5.pdf
Response to DPU-NG-1-62/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-6.pdf
Response to DPU-NG-1-72/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-7.pdf
Response to DPU-NG-1-82/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-8.pdf
Response to DPU-NG-1-92/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-9.pdf
Response to DPU-NG-1-102/14/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-10.pdf
DPU's 4th set of IR2/14/2012Department's Fourth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/21412dpuir4.pdf
Cover Letter2/13/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Revised Motion for Protective Treatment of Confidential Information. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/21312ngrvmtcl.pdf
Revised Motion for Confidentiality2/13/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Revised Motion for Protective Treatment of Confidential Information. By John K. Habib. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/21312ngrvmtn.pdf
DPU's 3rd set of IR2/9/2012Department's Third Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2912dpuir3.pdf
Attorney General’s Initial Comments2/8/2012Comments on behalf of the Attorney General. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2812agincm.pdf
DPU's 2nd set of IR2/6/2012Department of Public Utilities Second Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuir2.pdf
Stamp Approval2/6/2012STAMP APPROVAL: Attorney General's Notice of Retention of Experts and Consultants. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpustapag.pdf
Granted Petition2/6/2012GRANTED: Petition for Limited Participant Status of Western Massachusetts Electric Company. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapwm.pdf
AG's 1st set of IR2/6/2012Attorney General's First Set of Document and Information Requests and Certificate of Service. By Patrick J. Tarmey. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612agir1.pdf
Granted Petition2/6/2012GRANTED: Petition to Intervene of the Massachusetts Department of Energy Resources. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapdor.pdf
Granted - Petition2/6/2012GRANTED: Petition to Intervene of the Low-Income Weatherization and Fuel Assistance Program Network. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapliw.pdf
Granted Petition2/6/2012GRANTED: Petition for Limited Participant Status of NSTAR Electric Company. By Laura Bickel. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapnst.pdf
DOER Intervention Petition2/2/2012Petition to Intervene of the Massachusetts Department of Energy Resources. By Courtney Feeley Karp. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2212doerptn.pdf
Cover Letter2/1/2012Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptlt.pdf
Certificate of Service2/1/2012Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptcs.pdf
Appearance2/1/2012Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptap.pdf
Petition2/1/2012Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptn.pdf
DPU's 1st set of IR1/31/2012Department's First Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/13112dpuir1.pdf
Petition to Intervene1/31/2012Petition to Intervene and Appearance of Counsel on Behalf of the Low-Income Weatherization and Fuel Assistance Program Network By Jerrold Oppenheim. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/13112lipt.pdf
Reply to AG Motion and Opposition1/24/2012Reply of National Grid to the Attorney General's Motion for Leave to File Opposition to the Company's Motion for Protective Treatment, as well as its Opposition. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/12412ngrpagmt.pdf
Order of Notice1/23/2012Order of Notice, Notice of Public Hearing, to be held on Thursday, February 9, 2012 at 2 p.m., at the Department's offices. Comments due by February 2, 2012. By Mark D. Marini, Secretary. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/12312dpuordnt.pdf
Notice of Filing1/23/2012Order of Notice, Notice of Public Hearing, to be held on Thursday, February 9, 2012 at 2 p.m., at the Department's offices. Comments due by February 2, 2012. By Mark D. Marini, Secretary. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/12312dpuntfl.pdf
AG's Notice of Retention1/23/2012Attorney General's Notice of Retention of Experts and Consultants. By Patrick J. Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/12312agntrt.pdf
Cover Letter1/19/2012Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtcl.pdf
AG Motion for Leave1/19/2012Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtn.pdf
Certificate of Service1/19/2012Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtcs.pdf
AG opp to confidential1/19/2012Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtop.pdf
Filing for Limited Intervention1/18/2012Petition of NSTAR Electric Company for Limited Participant Status, and Notice of Appearance of Counsel by Steven Frias. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/11812nstptn.pdf
 1/11/2012Assignment of Hearing Officer, Laura Bickel. By Chair Berwick and Commissioner Westbrook. DPU 11-129 
Motion1/4/2012Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in Exhibits CAW-5 through CAW-11, Exh. PTZ-4(d), Exh. PTZ-5, and Exh. PTZ-6. By John K. Habib. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/20120104-motion.pdf
Notice of Intervention1/3/2012Attorney General's Notice of Intervention and Appearance of Counsel. By Patrick J. Tarmey. DPU 11-129http://www.env.state.ma.us/dpu/docs/electric/11-129/20120103-notice.pdf
Cover Letter12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptcl.pdf
CAW-1 Warren Testimony12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpttsw.pdf
CAW-2 WorcAreaMap12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptam.pdf
CAW-3 Deployment Schedule12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptds.pdf
CAW-412/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt4.pdf
CAW-5 REDACTED12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt5.pdf
Exhibit PTZ-5 (REDACTED)12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex5.pdf
Exhibit PTZ-6 (REDACTED)12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex6.pdf
Exhibit PTZ-3 A12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex3a.pdf
Exhibit PTZ-3 B12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex3b.pdf
Exhibit PTZ-4 A12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4a.pdf
Exhibit PTZ-4 B12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4b.pdf
Exhibit PTZ-4 C12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4c.pdf
Exhibit PTZ-4 D12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4d.pdf
CAW-11 (REDACTED)12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt11.pdf
EHW-1 Ed White Testimony12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt1.pdf
EHW-2 (O&E Plan)12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt2.pdf
EHW-312/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt3.pdf
Exhibit PTZ-1 (final)12/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex1.pdf
Exhibit PTZ-212/23/2011Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129.http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex2.pdf





Docket Service List
FirstLastCompanyAddressCityStateZipEmailFAXPhone
JerroldOppenheim, Esq.Democracy and Regulation57 Middle StreetGloucesterMA01930JerroldOpp@Yahoo.com978-283-0957978-283-0897
MichaelAltieri, EsqDepartment of Energy Resources100 Cambridge Street, Suite 1020BostonMA02114mike.altieri@state.ma.us 617-626-1398
RachelEvans, Esq.Department of Energy Resources100 Cambridge Street, Suite 1020BostonMA02114rachel.evans@state.ma.us617-727-0080617-727-4732
ChrisKingeMeter Strategic Consulting2215 Bridgepointe Parkway, Suite 300San MateoCA94404chris@emeter.com  
StevenFrias, Esq.Keegan Werlin LLP265 Franklin StreetBostonMA02110-3113sfrias@keeganwerlin.com617-951-1354617-951-0586
JohnHabib, Esq.Keegan Werlin LLP265 Franklin St., 6th FloorBostonMA02110-3113jhabib@keeganwerlin.com617-951-1354617-951-1400
AnnetteTran, Esq.Keegan Werlin LLP265 Franklin StreetBostonMA02110atran@keeganwerlin.com 617-951-1400
MelissaLiazos, Esq.National Grid40 Sylvan RoadWalthamMA02451melissa.liazos@us.ngrid.com781-907-5701781-907-2108
MeganTipperNational Grid40 Sylvan RoadWalthamMA02451megan.tipper@us.ngrid.com 781-907-1849
NancyBrockway, Esq.NBrockway & Associates10 Allen StreetBostonMA02131Nbrockway@aol.com 617-645-4018
JamieTosches, Esq.Office of the Attorney GeneralOne Ashburton PlaceBostonMA02108-1598jamie.tosches@state.ma.us617-727-1047617-963-2413
SandyNesciWestern Massachusetts Electric Company100 Summer Street, 23rd FloorBostonMA02110nesciss@nu.com