Docket Electronic Filings
| | Description | Date | Memo | URL |
| Appearance of Counsel | 9/4/2012 | Appearance of Counsel on behalf of the Department of Energy Resources. By Rachel Graham Evans. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/9412doerapcn.pdf |
| Notice of Withdrawal | 8/29/2012 | Notice of Withdrawal of Appearance of Counsel on behalf of Western Massachusetts Electric Company. By Donald Wells, Jr. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/82912wmntwd.pdf |
| Order | 8/3/2012 | ORDER. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/8312dpuord.pdf |
| Granted - Motion | 8/2/2012 | GRANTED - Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11-129-Filing-2844.pdf |
| Reply Brief by the Low-Income Network | 6/6/2012 | Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/6612liinbf.pdf |
| Reply Brief | 6/6/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Reply Briefs. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/6612ngrpb.pdf |
| Cover Letter | 6/1/2012 | Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexcl.pdf |
| Exhibit AG-2 | 6/1/2012 | Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexag-2.pdf |
| Exhibit AG-3 | 6/1/2012 | Attorney General's Exhibits AG-1, AG-2, and AG-3. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/61212agexag-3.pdf |
| Supplemental Response to RR-AG-13 | 6/1/2012 | Supplemental response of National Grid to RR-AG-13. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/6112nggrag-13.pdf |
| Cover Letter | 6/1/2012 | Supplemental response of National Grid to RR-AG-13. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/6112nggragcl.pdf |
| Supplement to Initial Brief | 5/30/2012 | Supplement to Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012lisib.pdf |
| Cover Letter | 5/30/2012 | Initial Brief of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012nginbcl.pdf.pdf |
| Initial Brief | 5/30/2012 | Initial Brief of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012nginb.pdf |
| Cover Letter | 5/30/2012 | Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcl.pdf |
| Initial Brief of the Attorney General | 5/30/2012 | Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbf.pdf |
| Cover Page | 5/30/2012 | Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcp.pdf |
| Certificate of Service | 5/30/2012 | Initial Brief of the Attorney General. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/53012aginbfcs.pdf |
| Omnibus Motion for Confidentiality | 5/25/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmto.pdf |
| Cover Letter | 5/25/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmtcl.pdf |
| Exhibit List | 5/25/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmtex.pdf |
| Motion for Submit Evidence Into Record | 5/25/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit: 1) Motion to Submit Evidence into the Record, 2) May 25, 2012 Exhibit List, 3) Omnibus Motion for Protective Treatment of Confidential Information and 4) Exhibit Copies. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52912ngflmt.pdf |
| Granted Motion | 5/24/2012 | GRANTED - Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By Marc Tassone (for Laura Bickel, Hearing Officer). DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/52412dpugrmt.pdf |
| Cover Letter | 5/23/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/52312ngmtexcl.pdf |
| Motion for Extension of Deadline | 5/23/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Extension of Deadline to File Final Set of Exhibits. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/52312ngmtex.pdf |
| Responses to AG First Set Discovery on RRs | 5/22/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1.pdf |
| AG-IR-RR-7 (Att 1) Two year pilot program | 5/22/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1a1.xlsx |
| AG-IR-RR-7 (Att 2) One year pilot program | 5/22/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the First Set of Information Requests on the Company's Record Requests noted on accompanying list along with a revised response and attachment to RR-DPU-8. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/52212ngrag1a2.xlsx |
| Initial Brief | 5/18/2012 | Initial Brief of the Low-Income Weatherization and Fuel Assistance Network. By Jerrold Oppenheim. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51812liinbf.pdf |
| AG's 1st set of IR | 5/18/2012 | Attorney General's First Set of Document and Information Requests on Record Request Responses. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51812agir1.pdf |
| Hearing Officer Ruling | 5/17/2012 | Hearing Officer Ruling on Attorney General's Motion for Leave to Conduct Discovery on Record Request Responses. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51712dpurul.pdf |
| Memorandum | 5/16/2012 | Memorandum re: Motions for Protective Treatment. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51712dpuhrul.pdf |
| Response to AG Proced Motion | 5/14/2012 | RESPONSEof Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Herrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrag.pdf |
| Response to RR-DPU-16 | 5/14/2012 | RESPONSEof Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Herrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrd-16.pdf |
| Appendix F | 5/14/2012 | RESPONSEof Low-Income Weatherization and Fuel Assistance Network to Attorney General's Procedural Motion. By Herrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412liwrap.pdf |
| | 5/14/2012 | TRANSCRIPT - Public Hearing, held on Friday, May 4, 2012, at the Department of Public Utilities, One South Station, Boston. Vol. 4, Pages 627-813. DPU 11-129 | |
| Attachment to RR-AG-16 | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag-16a.pdf |
| Responses to DPU RRs | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrd.pdf |
| Responses to AG RRs | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag.pdf |
| Responses to LIN RRs | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrli.pdf |
| Response to RR-AG-16 | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrag-16.pdf |
| Cover Letter | 5/14/2012 | RESPONSE to Record Requests on Behalf of Massachusetts Electric Company and Nantucket Electric Company RR-AG-1 through RR-AG-16, RR-DPU-1 through RR-DPU-15, and RR-LIN-1 through RR-LIN-4. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51412ngrcl.pdf |
| Opposition to AG's Motion for Leave | 5/11/2012 | Opposition to Attorney General’s Motion for Leave to Conduct Discovery on Responses to Record Requests and for Amendment of the Procedural Schedule. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51112ngopp.pdf |
| Cover Letter | 5/11/2012 | Opposition to Attorney General’s Motion for Leave to Conduct Discovery on Responses to Record Requests and for Amendment of the Procedural Schedule. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/51112ngoppcl.pdf |
| Memorandum | 5/9/2012 | Memorandum re: Responses to Attorney General's May 8, 2012 Motion. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/5912dpumem.pdf |
| Cover Letter | 5/7/2012 | Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtcl.pdf |
| Certificate of Service | 5/7/2012 | Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtcs.pdf |
| AG's Motion for Leave | 5/7/2012 | Attorney General submits Motion for Leave to Conduct Discovery on Record Requests and for Amendment of the Procedural Schedule, along with Certificate of Service. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/5712agmtn.pdf |
| | 5/4/2012 | TRANSCRIPT - Continued Public Hearing held at the Department of Public Utilities, May 2, 2012. Vol. 2, Pages 182-425. | |
| | 5/4/2012 | TRANSCRIPT - Continued Public Hearing, held at the Department of Public Utilities on Thursday, May 3, 2012. Vol. 3, Pages 426-626. DPU 11-129 | |
| | 5/4/2012 | TRANSCRIPT of Public Hearing held at the Department of Public Utilities, April 30, 2012. Vol. 1, Pages 1-181. | |
| Cover Letter | 4/30/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8cl.pdf |
| Response to DPU-8-8 [Supplemental])[REDACTED] | 4/30/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8-8.pdf |
| Motion for Confidentiality (DPU-8-8 Supplemetal) | 4/30/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit supplemental redacted response to DPU-NG-8-8, along with a Motion for Protective Treatment. By Jack Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/43012ngsrd8mt.pdf |
| Cover Letter | 4/27/2012 | REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvrcl.pdf |
| Response to DPU-NG-2-5 REVISED (Redacted) | 4/27/2012 | REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvr2-5.pdf |
| Attachment to AG-5-24-2 (Redacted) | 4/27/2012 | REVISED RESPONSE of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Question DPU-NG-2-5 to the Department of Public Utilities. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/42712ngrvr5-24a.pdf |
| Surrebuttal Testimony | 4/27/2012 | Surrebuttal Testimony of Barbara Alexander with Exhibit, on behalf of the Attorney General. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42712agst.pdf |
| ComEd CAP Final Analysis | 4/27/2012 | Surrebuttal Testimony of Barbara Alexander with Exhibit, on behalf of the Attorney General. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42712agsta.pdf |
| Cover Letter | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdcl.pdf |
| NGrid Responses to AG Set 5 (public) | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrag5.pdf |
| Response to DPU Set 5, [SUPPLEMENTAL 5-4] | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd5.pdf |
| Motion for Confidentiality | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdmt.pdf |
| Responses to DPU Set 9 (minus redacted 9-2(att) | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd9.pdf |
| Response to DPU Set 8 [PUBLIC] | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8.pdf |
| Attachment to DPU-8-14 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-14a.xls |
| Attachment to DPU-8-15 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-15a.xls |
| Exhibit PTZ-5 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrdex.pdf |
| Attachment to DPU-8-5 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-5a.xls |
| Attachment to DPU-8-6 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-6a.xls |
| Attachment to DPU-8-9 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-9a.xls |
| Attachment to DPU-8-12 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-12a.xls |
| Attachment to DPU-8-13 | 4/26/2012 | National Grid’s Responses to the Department's Eighth and Ninth Set of Information Requests as well as the Fifth Set of Information Requests from the Office of the Attorney General. Motion for Protective Treatment of Confidential Information. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42612ngrd8-13a.xls |
| Memorandum | 4/25/2012 | Hearing Officer Memorandum Re: Procedural Schedule. By Laura Bickel. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/42512dpumem.pdf |
| Rebuttal Testimony | 4/18/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Rebuttal Testimony. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41812ngrbts.pdf |
| Motion for Protective Treatment | 4/18/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Motion for Protective Treatment associated with Information Request DPU-7-6. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41812ngmtpt.pdf |
| NGRID Redacted Responses to AG Set 4 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit REDACTED responses to Information Requests: AG-4-12, AG-4-13, AG-4-22, AG-4-23, AG-4-24, AG-4-25, AG-4-26 and AG-4-30. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrag4.pdf |
| Responses to DPU's 7th set of IR | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7.pdf |
| Attachment to DPU-7-12-1 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a1.xls |
| Attachment to DPU-7-12-2 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a2.xls |
| Attachment to DPU-7-12-3 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a3.xlsx |
| Attachment to DPU-7-12-4 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a4.xls |
| Attachment to DPU-7-12-5 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a5.xls |
| Attachment to DPU-7-12-6 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a6.xls |
| Attachment to DPU-7-12-7 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a7.xls |
| Attachment to DPU-7-12-8 | 4/17/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Seventh Set of Information Requests. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41712ngrdir7-12a8.xls |
| Motion for Confidentiality | 4/13/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Sixth Set of Information Requests. Confidential responses to DPU-6-2, 6-7 and 6-12, and confidential attachments DPU-6-15-1 and 6-15-2. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/41312ngrd6.pdf |
| Responses to DPU's 6th set of IR | 4/13/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Sixth Set of Information Requests. Confidential responses to DPU-6-2, 6-7 and 6-12, and confidential attachments DPU-6-15-1 and 6-15-2. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/41312ngrd6mt.pdf |
| DPU's 8th set of IR | 4/12/2012 | Department's Eighth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/41212dpuir8.pdf |
| DPU's 9th set of IR | 4/12/2012 | Department's Ninth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/41212dpuir9.pdf |
| AG's 5th set of IR | 4/12/2012 | Attorney General's Fifth Set of Information and Document Requests and Certificate of Service. By Patrick Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/41212agir5.pdf |
| Cover Letter | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litscl.pdf |
| Direct Testimony | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912lits.pdf |
| Affidavit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litsaf.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex1.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex2.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex3.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex4.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex5.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex6.pdf |
| Exhibit | 4/9/2012 | The Low-Income Weatherization and Fuel Assistance Program Network submits Direct Testimony of Nancy Brockway. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912litstex7.pdf |
| Prepared Testimony | 4/9/2012 | Prepared Testimony of Barbara R. Alexander on behalf of the Attorney General. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4912agtst.pdf |
| NGrid Responses to AG Set 4 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4.pdf |
| Motion for Confidentiality (AG Set 4) | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4mt.pdf |
| Attachment to AG-4-1-1 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-1a.pdf |
| Attachment to AG-4-1-2 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-2a.pdf |
| Attachment to AG-4-1-3 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-3a.pdf |
| Attachment to AG-4-1-4 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-4a.pdf |
| Attachment to AG-4-1-5 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-5a.pdf |
| Attachment to AG-4-1-6 | 4/6/2012 | Responses of Massachusetts Electric Company d/b/a National Grid to the Attorney General's Fourth Set of Information Requests. Motion for Protective Treatment of Confidential Information to the Company's responses to AG-4-12, 4-13, 4-22, 4-23, 4-24, 4-25, 4-26 and 4-30. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/4612ngrag4-6a.pdf |
| | 4/2/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Eighth and Ninth Set of Information Requests and the Attorney General's Fifth Set of Information Request Along with Motion for Protective Treatment. Lastly, the National Grid is also Filing an Un-Redacted version of PTZ-5 which it had intended to file on February 13, 2012. By John K. Habib. DPU 11-129. | |
| DPU's 7th set of IR | 3/30/2012 | Department of Public Utilities Seventh Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/32912dpuir7.pdf |
| DPU's 6th set of IR | 3/29/2012 | Department of Public Utilities Sixth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/32912dpuir6.pdf |
| AG's 4th set of IR | 3/23/2012 | Attorney General submits Fourth Set of Information and Document Requests and Certificate of Service. By Patrick Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/32312agir4.pdf |
| Cover Letter | 3/20/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's redacted version of Attachment DPU-5-7. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/32012ngrdat5-7l.pdf |
| DPU-NG-5-7 (att) (REDACTED) | 3/20/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's redacted version of Attachment DPU-5-7. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/32012ngrdat5-7.pdf |
| Responses tp DPU's 5th set of IR | 3/19/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Fifth Set of Information Requests as noted on accompanying list. Along with a Motion for Protective Treatment. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrd5.pdf |
| Motion for Confidentiality (DPU Set 5) | 3/19/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities Fifth Set of Information Requests as noted on accompanying list. Along with a Motion for Protective Treatment. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrd5mt.pdf |
| Responses to AG's 3rd set of IR | 3/19/2012 | Responses of National Grid to the Attorney General's Third Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31912ngrag3.pdf |
| Responses to LIN's 1st set of IR | 3/14/2012 | National Grid's Responses to the First Set of Information Requests of the Low-Income Weatherization and Fuel Assistance Program Network. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngrli.pdf |
| Cover Letter | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtcl.pdf |
| Motion for Confidentiality | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtn.pdf |
| LIN-1-17-1 (REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-1.pdf |
| LIN-1-17-2 (REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-2.pdf |
| LIN-1-17-3(a)(REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-3a.pdf |
| LIN-1-17-3(b)(REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-3b.pdf |
| LIN-1-17-4 (a) (REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-4a.pdf |
| LIN-1-17-4 (b) (REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-4b.pdf |
| LIN-1-17-5 (REDACTED) | 3/14/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in LIN-1-17-1, 1-17-2, 1-17-3(a), 1-17-3(b), 1-17-4(a), 1-17-4(b), 1-17-5. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/31412ngmtli1-17-5.pdf |
| AG - Topics for Discussion in Tech Conf | 3/8/2012 | List of Additional Topics for Discussion for National Grid’s Smart Grid Information Technology Technical Conference. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3812aglist.pdf |
| NGrid Responses to AG Set 2 | 3/7/2012 | National Grid's responses to the Attorney General's Second Set of Information Requests. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3712ngrag2.pdf |
| Attachment to AG-2-15 | 3/7/2012 | National Grid's responses to the Attorney General's Second Set of Information Requests. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3712ngrag2a.xls |
| Memorandum | 3/6/2012 | Memorandum to Service List RE: Technical Conference on March 9, 2012. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/3612dpumem.pdf |
| Low Income Motion re Tech Session questions | 3/5/2012 | Motion of the Low-Income Weatherization and Fuel Assistance Program Network to allow Nancy Brockway to attend the Technical Conference as an expert witness. By Jerrold Oppenheim. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3512leanmt.pdf |
| AG's 3rd set of IR | 3/5/2012 | Attorney General's Third Set of Document and Information Requests. By Patrick J. Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3512agir3.pdf |
| DPU's 5th set of IR | 3/2/2012 | Department's Fifth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/3212dpuir5.pdf |
| Responses to DPU's 4th set of IR | 2/29/2012 | Responses of National Grid to the Department's Fourth Set of Information Requests. By John Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22912ngrd4.pdf |
| Motion for Confidentiality | 2/27/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in its response to DPU-2-5. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngmtn.pdf |
| Low Income Data Requests,Set 1 | 2/27/2012 | First Set of Data Requests of the Low-Income Weatherization and Fuel Assistance Program Network. By Jerrold Oppenheim. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712leandtrq.pdf |
| Cover Letter | 2/27/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3cl.pdf |
| Company Responses to DPU 2-2, 2-4 thru 2-7 | 2/27/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3.pdf |
| Responses to DPU's 3rd set of IR | 2/27/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd2.pdf |
| DPU-NG-3-6-2 SmartGrid Price Elasticity | 2/27/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Third Set of Information Requests and the remaining responses to the Second Set of Information Requests of the Department of Public Utilities. By John Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22712ngrd3-6a.xls |
| Motion for Protective Treatment | 2/22/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in Attachment AG-1-50(a). By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngmtn.pdf |
| Stamp-Approval Extension | 2/22/2012 | GRANTED - Motion of National Grid for an Extension of Deadline to File Responses to the Department of Public Utilities' Information Requests. By Laura Bickel. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212dpugrmt.pdf |
| Schedule, Service List, and Ground Rules | 2/22/2012 | Procedural Schedule, Service List, and Ground Rules. By Laura Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212dpupsc.pdf |
| Cover Letter | 2/22/2012 | National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrag1cl.pdf |
| Responses to AG Set 1 | 2/22/2012 | National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrag1.pdf |
| Responses to DPU Set 2 (minus 2-2, 2-4 thru 2-7) | 2/22/2012 | National Grid's responses to the Attorney General's First Set of Information Requests and the Department's Second Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/22212ngrd2.pdf |
| AG's 2nd set of IR | 2/21/2012 | Attorney General's Second Set of Document and Information Requests to Massachusetts Electric Co. and Nantucket Electric Co. d/b/a National Grid. By Patrick Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/22112agir2.pdf |
| | 2/17/2012 | TRANSCRIPT - Public Hearing, held on Thursday, February 9, 2012 at 2 p.m., at the Department of Public Utilities. Vol. A, pages 1-11. DPU 11-129 | |
| Motion for Extension of Deadline | 2/17/2012 | Motion of National Grid for an Extension of Deadline to File Responses to the Department of Public Utilities' Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21712ngmtex.pdf |
| DPU's 4th set of IR | 2/14/2012 | Department's Fourth Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412dpuir4.pdf |
| Cover Letter | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1cl.pdf |
| Response to DPU-NG-1-1 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-1.pdf |
| Response to DPU-NG-1-2 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-2.pdf |
| Response to DPU-NG-1-3 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-3.pdf |
| Response to DPU-NG-1-10 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-10.pdf |
| Response to DPU-NG-1-4 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-4.pdf |
| Response to DPU-NG-1-5 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-5.pdf |
| Response to DPU-NG-1-6 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-6.pdf |
| Response to DPU-NG-1-7 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-7.pdf |
| Response to DPU-NG-1-8 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-8.pdf |
| Response to DPU-NG-1-9 | 2/14/2012 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's First Set of Information Requests. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/21412ngrd1-9.pdf |
| Cover Letter | 2/13/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Revised Motion for Protective Treatment of Confidential Information. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/21312ngrvmtcl.pdf |
| Revised Motion for Confidentiality | 2/13/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Revised Motion for Protective Treatment of Confidential Information. By John K. Habib. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/21312ngrvmtn.pdf |
| DPU's 3rd set of IR | 2/9/2012 | Department's Third Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2912dpuir3.pdf |
| Attorney General’s Initial Comments | 2/8/2012 | Comments on behalf of the Attorney General. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2812agincm.pdf |
| Granted Petition | 2/6/2012 | GRANTED: Petition for Limited Participant Status of NSTAR Electric Company. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapnst.pdf |
| Stamp Approval | 2/6/2012 | STAMP APPROVAL: Attorney General's Notice of Retention of Experts and Consultants. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpustapag.pdf |
| Granted - Petition | 2/6/2012 | GRANTED: Petition to Intervene of the Low-Income Weatherization and Fuel Assistance Program Network. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapliw.pdf |
| AG's 1st set of IR | 2/6/2012 | Attorney General's First Set of Document and Information Requests and Certificate of Service. By Patrick J. Tarmey. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612agir1.pdf |
| Granted Petition | 2/6/2012 | GRANTED: Petition to Intervene of the Massachusetts Department of Energy Resources. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapdor.pdf |
| Granted Petition | 2/6/2012 | GRANTED: Petition for Limited Participant Status of Western Massachusetts Electric Company. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuapwm.pdf |
| DPU's 2nd set of IR | 2/6/2012 | Department of Public Utilities Second Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Laura Bickel. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/2612dpuir2.pdf |
| DOER Intervention Petition | 2/2/2012 | Petition to Intervene of the Massachusetts Department of Energy Resources. By Courtney Feeley Karp. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2212doerptn.pdf |
| Cover Letter | 2/1/2012 | Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptlt.pdf |
| Certificate of Service | 2/1/2012 | Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptcs.pdf |
| Appearance | 2/1/2012 | Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptap.pdf |
| Petition | 2/1/2012 | Western Massachusetts Electric Company's Petition for Limited Participant Status, and Appearance of Counsel. By Donald Wells, Jr. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/2112wmptn.pdf |
| DPU's 1st set of IR | 1/31/2012 | Department's First Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid. By Laura C. Bickel, Hearing Officer. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/13112dpuir1.pdf |
| Petition to Intervene | 1/31/2012 | Petition to Intervene and Appearance of Counsel on Behalf of the Low-Income Weatherization and Fuel Assistance Program Network By Jerrold Oppenheim. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/13112lipt.pdf |
| Reply to AG Motion and Opposition | 1/24/2012 | Reply of National Grid to the Attorney General's Motion for Leave to File Opposition to the Company's Motion for Protective Treatment, as well as its Opposition. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/12412ngrpagmt.pdf |
| AG's Notice of Retention | 1/23/2012 | Attorney General's Notice of Retention of Experts and Consultants. By Patrick J. Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/12312agntrt.pdf |
| Order of Notice | 1/23/2012 | Order of Notice, Notice of Public Hearing, to be held on Thursday, February 9, 2012 at 2 p.m., at the Department's offices. Comments due by February 2, 2012. By Mark D. Marini, Secretary. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/12312dpuordnt.pdf |
| Notice of Filing | 1/23/2012 | Order of Notice, Notice of Public Hearing, to be held on Thursday, February 9, 2012 at 2 p.m., at the Department's offices. Comments due by February 2, 2012. By Mark D. Marini, Secretary. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/12312dpuntfl.pdf |
| Cover Letter | 1/19/2012 | Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtcl.pdf |
| AG Motion for Leave | 1/19/2012 | Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtn.pdf |
| Certificate of Service | 1/19/2012 | Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtcs.pdf |
| AG opp to confidential | 1/19/2012 | Attorney General's Motion for Leave to File Opposition to the Company's January 4, 2012 Motion for Protective Treatment of Confidential Information. By Patrick Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11912agmtop.pdf |
| Filing for Limited Intervention | 1/18/2012 | Petition of NSTAR Electric Company for Limited Participant Status, and Notice of Appearance of Counsel by Steven Frias. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/11812nstptn.pdf |
| | 1/11/2012 | Assignment of Hearing Officer, Laura Bickel. By Chair Berwick and Commissioner Westbrook. DPU 11-129 | |
| Motion | 1/4/2012 | Motion of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid for Protective Treatment of Confidential Information in Exhibits CAW-5 through CAW-11, Exh. PTZ-4(d), Exh. PTZ-5, and Exh. PTZ-6. By John K. Habib. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/20120104-motion.pdf |
| Notice of Intervention | 1/3/2012 | Attorney General's Notice of Intervention and Appearance of Counsel. By Patrick J. Tarmey. DPU 11-129 | http://www.env.state.ma.us/dpu/docs/electric/11-129/20120103-notice.pdf |
| Cover Letter | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptcl.pdf |
| CAW-1 Warren Testimony | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpttsw.pdf |
| CAW-2 WorcAreaMap | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptam.pdf |
| Exhibit PTZ-4 B | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4b.pdf |
| Exhibit PTZ-4 C | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4c.pdf |
| Exhibit PTZ-4 D | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4d.pdf |
| Exhibit PTZ-5 (REDACTED) | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex5.pdf |
| Exhibit PTZ-6 (REDACTED) | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex6.pdf |
| EHW-3 | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt3.pdf |
| Exhibit PTZ-1 (final) | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex1.pdf |
| Exhibit PTZ-2 | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex2.pdf |
| Exhibit PTZ-3 A | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex3a.pdf |
| Exhibit PTZ-3 B | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex3b.pdf |
| Exhibit PTZ-4 A | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptex4a.pdf |
| CAW-3 Deployment Schedule | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngptds.pdf |
| CAW-4 | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt4.pdf |
| CAW-5 REDACTED | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt5.pdf |
| CAW-11 (REDACTED) | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt11.pdf |
| EHW-1 Ed White Testimony | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt1.pdf |
| EHW-2 (O&E Plan) | 12/23/2011 | Petition by Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid for approval of a smart grid pilot program. Appearances of Counsel of Megan F. S. Tipper, John Habib, and Annette Tran. Prefiled Direct Testimony of Cheryl Warren, Edward H. White, Jr. and Peter T. Zschokke. By Megan F. S. Tipper. DPU 11-129. | http://www.env.state.ma.us/dpu/docs/electric/11-129/122311ngpt2.pdf |