Docket Electronic Filings
| | Description | Date | Memo | URL |
| Comments | 5/3/2013 | Comments on behalf of.the Solar Energy Industries Association, the Interstate Renewable Energy Council, and the Solar Energy Business Association of New England. By Carrie Cullen Hitt. DPU 11-75 and 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-75/11-75-Comments-2639.pdf |
| Memorandum | 1/2/2013 | Memorandum re: Implementation of System of Assurance of Net Metering Eligibility. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/1213dpumem.pdf |
| Net Metering Crediting and Billing Presentation | 12/19/2012 | Fitchburg Gas and Electric Light Company d/b/a Unitil submits final version of its presentation. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/121912fgentmt.pdf |
| Net Metering Crediting and Billing Presentation | 12/14/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit final version of their presentation, initially presented at the Technical Conference on December 6, 2012. By Brooke Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/121412ngntmp.pdf |
| Cover Letter | 12/14/2012 | Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit final version of their presentation, initially presented at the Technical Conference on December 6, 2012. By Brooke Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/121412ngntmcl.pdf |
| | 12/14/2012 | NSTAR and Western Massachusetts Electric Company jointly submit presentations made by the Companies at the technical conference of December 6, 2012. By John Habib. DPU 11-11 | |
| Unitil Presentation | 12/7/2012 | Fitchburg Gas and Electric Light Company d/b/a Unitil submits copy of its presentation from the technical conference of December 6, 2012. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/12712fgeprs.pptx |
| Memorandum | 12/4/2012 | Memorandum re: Technical Conference on Thursday, December 6, 2012. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/12412dpumem.pdf |
| Contract with Cadmus | 11/27/2012 | Executed Agreement by and between: (1) Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, and Northeast Utilities Service Company as agent for its Massachusetts affiliates, NSTAR Electric Company, and Western Massachusetts Electric Company; and (2) the Cadmus Group, Inc. By John Habib. DPU 11-11-D | http://www.env.state.ma.us/dpu/docs/electric/11-11/112712fgecntr.pdf |
| Approval of Request for Extension | 11/23/2012 | APPROVED - Request by the Distribution Companies for a further extension of time until November 26, 2012, to file an executed contract with the Cadmus Group. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/112312dpuaprv.pdf |
| | 11/21/2012 | Request by the Distribution Companies for a further extension of time until November 26, 2012, to file an executed contract with the Cadmus Group. By John Habib. DPU 11-11 | |
| APPROVED - Motion | 11/16/2012 | APPROVED - Motion of Fitchburg Gas and Electric Light Company d/b/a Unitil for Extension of the Deadline to File an Executed Contract with The Cadmus Group. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111612dpuaprv.pdf |
| | 11/15/2012 | Motion of Fitchburg Gas and Electric Light Company d/b/a Unitil for Extension of the Deadline to File an Executed Contract with The Cadmus Group. By John Habib. DPU 11-11 | |
| Comments | 11/9/2012 | Comments of My Generation Energy, Inc. By Michael Stone. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/11912mgncmn.pdf |
| Comments of CVEC and CLC | 11/9/2012 | Joint Comments of the Cape & Vineyard Electric Cooperative, Inc. and the Cape Light Compact. By Jeffrey Bernstein, Rebecca Zachas, and Audrey Eidelman. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/11912cvjcm.pdf |
| Comments of the Distribution Companies | 11/9/2012 | Comments on behalf of the Distribution Companies. By John Habib. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/11912dsccomn.pdf |
| Comments of Klavens Law Group | 11/9/2012 | Comments by the Klavens Law Group, P.C. By Jonathan Klavens. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/11912klgcmn.pdf |
| Notice of Technical Conference | 11/2/2012 | Memorandum RE: Notice of Technical Conference - Canceled on Tuesday, November 13, 2012 and Rescheduled to Thursday, December 6, 2012. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/11212dpumem.pdf |
| Comments of EMI | 10/31/2012 | Comments of EMI Solar Holdings, LLC. By Mitchell Jacobs. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/103112emicm.pdf |
| Memorandum | 10/31/2012 | Memorandum to Service List, RE: Net Metering and Interconnection of Distributed Generation - Revised Comment Deadline. By Laura Bickel. DPU 11-11-C. | http://www.env.state.ma.us/dpu/docs/electric/11-11/103112dpumem.pdf |
| Comments | 10/26/2012 | Comments on behalf of the Distribution Companies: Fitchburg Gas & Electric Light Company d/b/a Unitil; Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid; NSTAR Electric Company, and Western Massachusetts Electric Company. By John Habib. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/102612dcmcmn.pdf |
| Comments of Klavens Law Group | 10/26/2012 | Comments by the Klavens Law Group. By Jonathan Klavens. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/102612klgcmn.pdf |
| Comments on behalf of Nexamp | 10/26/2012 | Comments on behalf of Nexamp. By Jonathan Abe. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/102612nxmpcm.pdf |
| Comments of CVEC and CLC | 10/26/2012 | Comments on behalf of the Cape & Vineyard Electric Corporation, Inc., and the Cape Light Compact. By Jeffrey Bernstein, Rebecca Zachas, and Audrey Eidelman. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/102612clccmn.pdf |
| Order | 10/25/2012 | ORDER Issued. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-D. | http://www.env.state.ma.us/dpu/docs/electric/11-11/102512dpuord.pdf |
| System of Assurance App A | 10/25/2012 | ORDER Issued. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-D. | http://www.env.state.ma.us/dpu/docs/electric/11-11/102512dpuordapa.pdf |
| System of Assurance App B | 10/25/2012 | ORDER Issued. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-D. | http://www.env.state.ma.us/dpu/docs/electric/11-11/102512dpuordapb.pdf |
| System of Assurance App C | 10/25/2012 | ORDER Issued. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-D. | http://www.env.state.ma.us/dpu/docs/electric/11-11/102512dpuordapc.pdf |
| Memorandum | 10/19/2012 | Memorandum inviting comments due by Friday, November 2, 2012. By Laura Bickel, Hearing Officer. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/101912dpumem.pdf |
| Notice of Technical Conference | 10/12/2012 | Memorandum regarding Technical Conference on Tuesday, November 13, 2012. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101212dpumemn.pdf |
| Comments | 10/5/2012 | Joint Comments on behalf of the Cape & Vineyard Electric Cooperative, Inc., and the Cape Light Compact. By Jeffrey Bernstein, and Rebecca Zachas, and Audrey Eidelman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/10512cveccm.pdf |
| Notice of Withdrawal | 10/4/2012 | Attorney General submits Notice of Withdrawal of Charlynn R. Hull. By Charlynn R. Hull. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/10412agntwd.pdf |
| Memorandum | 9/24/2012 | MEMORANDUM To Service List: RE: Net Metering and Interconnection of Distributed Generation. By Laura C. Bickel. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/92412dpumem.pdf |
| NM Assurance - Cadmus Third Revised Cost Estimate | 9/24/2012 | MEMORANDUM To Service List: RE: Net Metering and Interconnection of Distributed Generation. By Laura C. Bickel. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/92412dpumema.pdf |
| NM Assurance - Cadmus Third Revised Cost Estimate | 9/13/2012 | Third Revised Cost Estimate, submitted by The Cadmus Group, Inc. By David Beavers. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/91312cgrest3.pdf |
| Cadmus Second Revised Cost Estimate | 9/11/2012 | Second Revised Cost Estimate, submitted by The Cadmus Group, Inc. By David Beavers. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/91312cgrest2.pdf |
| | 8/24/2012 | Notice of Withdrawal of Appearance of Counsel on behalf of Western Massachusetts Electric Company. By Donald H. Wells, Jr. DPU 11-11 | |
| Order | 8/24/2012 | ORDER ON DEFINITIONS OF UNIT AND FACILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-C | http://www.env.state.ma.us/dpu/docs/electric/11-11/82412dpuord.pdf |
| | 8/20/2012 | Apperaance of Counsel on behalf of Western Massachusetts Electric Company. By John Habib. DPU 11-11 | |
| AG's Notice of Appearance | 7/24/2012 | Attorney General's Appearance of Counsel. By Nathan Forster. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/72412agapcn.pdf |
| Cadmus Administrator Costs Estimate Update | 7/16/2012 | Distribution Companies submit letter and updated cost estimates of the Cadmus Group, Inc. By Gary Epler, Brooke E. Skulley, Jack K. Habib, and Donald H. Wells. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/71612dsclet.pdf |
| Order | 6/29/2012 | ORDER ON PROPOSED CANDIDATE FOR THE ADMINISTRATOR OF THE SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-B | http://www.env.state.ma.us/dpu/docs/electric/11-11/62912dpuord.pdf |
| | 6/29/2012 | Attorney General submits Withdrawal of Counsel. By Bruce F. Anderson. DPU 11-11. | |
| AG's Withdrawal of Counsel | 6/26/2012 | Notice of Withdrawal of Counsel on behalf of the Attorney General. By Danielle Rathbun. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/62512agwdcn.pdf |
| Compliance Fling | 6/26/2012 | Compliance Fling on behalf of Fitchburg Gas and Electric Light Company, Massachusetts Electric Company and Nantucket Electric Company, NSTAR Electric Company, and Western Massachusetts Electric Company, for the proposed selection of the Cadmus Group for Administrator in Massachusetts. DPU 11-11-A | http://www.env.state.ma.us/dpu/docs/electric/11-11/62612dsccmp.pdf |
| MDAR's Comments | 6/6/2012 | Comments of the Massachusetts Department of Agricultural Resources. By Robert W. Ritchie, General Counsel. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6612mdarcmn.pdf |
| Reply Comments | 6/5/2012 | Reply Comments of My Generation Energy. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6512mgnrpcm.pdf |
| AG's Notice of Appearance | 6/5/2012 | Attorney General's Notice of Appearance of Counsel. By Bruce F. Anderson. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6512agntap.pdf |
| Reply Comments of Klavens Law Group | 6/5/2012 | Comments of Klavens Law Group, P.C. By Jonathan Klavens, DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6512klgcmn.pdf |
| Reply Comments | 6/5/2012 | Comments of True North Energy, LLC. By Mark C. Kalpin. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6512tnerpcm.pdf |
| Cover Letter | 6/4/2012 | Reply Comments of The Department of Energy Resources. By Courtney Feely Karp. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/6412doerrpcml.pdf |
| DOER Reply Comments | 6/4/2012 | Reply Comments of The Department of Energy Resources. By Courtney Feely Karp. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/6412doerrpcm.pdf |
| Reply Comments | 6/4/2012 | Reply Comments of Renewable Resource Development Coalition. By Mary Beth Gentleman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/6412rrdrpcm.pdf |
| Reply Comments of CVEC & CLC | 6/4/2012 | Reply Comments of the Cape Light Compact and the Cape & Vineyard Electric Cooperative, Inc. By Audrey A. Eidelman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/6412clcrpcm.pdf |
| Distribution Companies’ Reply Comments | 6/4/2012 | Reply Comments Fitchburg Gas and Electric Light Company d/b/a Unitil, National Grid, NSTAR Electric Company and Western Massachusetts Electric Company (collectively the "Distribution Companies"). By Gary Epler, Brooke E. Skulley, John K. Habib and Donald H. Wells, Jr. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/6412dscmrp.pdf |
| Comments of My Generation Energy | 5/29/2012 | Comments of My Generation Energy, Inc. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512mgncm.pdf |
| Initial Comments of CVEC & CLC | 5/29/2012 | Initial Comments of the Cape Light Compact and the Cape & Vineyard Electric Cooperative, Inc. By Audrey Eidelman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512clccmn.pdf |
| Comments of Broadway Electrical Company | 5/25/2012 | Comments of Broadway Electrical Company, Inc. and Broadway Renewable Strategies LLC. By Jeffrey Wbotan. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512belcmn.pdf |
| Cover Letter | 5/25/2012 | Initial Comments of the Department of Energy Resources. By Courtney Feeley Karp. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512doerincl.pdf |
| DOER Initial Comments | 5/25/2012 | Initial Comments of the Department of Energy Resources. By Courtney Feeley Karp. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512doerincm.pdf |
| Comments | 5/25/2012 | Comments of the Renewable Resource Development Coalition. By Mary Beth Gentleman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512rrdcm.pdf |
| Comments | 5/25/2012 | Comments on behalf of UGT Renewable Energy 7, LLC. By Mark C. Kalpin. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512utgcmn.pdf |
| Initial Comments of NECEC | 5/25/2012 | Initial Comments of The New England Clean Energy Council. By Peter Rothstein, President. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512necincm.pdf |
| Comments of Brightridge Solar | 5/25/2012 | Letter from Brightridge Solar in support and agreement of comments of Renewable Resource Development Coalition. By Eric G. Roddy, CEO. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512bghtscm.pdf |
| Comments | 5/25/2012 | Fitchburg Gas and Electric Light Company d/b/a Unitil, National Grid, NSTAR Electric Company and Western Massachusetts Electric Company (collectively, the Distribution Companies) submit initial comments. By Gary Epler, Brooke E. Skulley, John K. Habib and Donald H. Wells, Jr.. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512edsccmn.pdf |
| Comments of Westford Solar | 5/25/2012 | Comments on behalf of Westford Solar Holdings, LLC. By Mark C. Kalpin. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512wshcm.pdf |
| Comments of True North Energy | 5/25/2012 | Comments on behalf of True North Energy, LLC. By Mark C. Kalpin. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512tnencm.pdf |
| Comments | 5/25/2012 | Comments of the Massachusetts Department of Agricultural Resources. By Gerry Palano. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52512darcmn.pdf |
| Comments of EMI Dartmouth Solar | 5/24/2012 | Letter from EMI Dartmouth Solar, LLC regarding the definition of Net Metering Facilities. By Mitchell H. Jacobs, Manager. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/52412emidscm.pdf |
| | 5/11/2012 | E-mail to Laura Bickel from EMI Power Systems, LLC regarding definition of Class III facility. By Mitchell Jacobs. DPU 11-11 | |
| Memorandum | 5/11/2012 | Memorandum Re: Net metering generating capacity of Class I, Class II, and Class III facilities. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/51112dpumemuf.pdf |
| Memorandum | 5/11/2012 | Memorandum Re: System of Assurance of Net Metering Eligibility. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/51112dpumemsa.pdf |
| Order | 5/7/2012 | ORDER ADOPTING A SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-A | http://www.env.state.ma.us/dpu/docs/electric/11-11/5712dpuord.pdf |
| System of Assurance App. A | 5/7/2012 | ORDER ADOPTING A SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-A | http://www.env.state.ma.us/dpu/docs/electric/11-11/5712dpuorda.pdf |
| System of Assurance App. B (redlined) | 5/7/2012 | ORDER ADOPTING A SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11-A | http://www.env.state.ma.us/dpu/docs/electric/11-11/5712dpuordb.pdf |
| | 11/22/2011 | Affidavit of Jeanne Lloyd relating to National Grid's responses to the Department's Third Set of Information Requests. By Brooke E. Skulley. DPU 11-11 | |
| Cover Letter | 11/21/2011 | Affidavit of Carmel M. Gondek on behalf of Western Massachusetts Electric Company, for the Company's responses to the Department's Third Set of Information Requests filed on November 18, 2011. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/112111wmafcl.pdf |
| Gondek Affidavit | 11/21/2011 | Affidavit of Carmel M. Gondek on behalf of Western Massachusetts Electric Company, for the Company's responses to the Department's Third Set of Information Requests filed on November 18, 2011. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/112111wmaf.pdf |
| Response to DPU's 3rd set of IR | 11/21/2011 | Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's Third Set of Information Requests. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811fgrd3.pdf |
| Cover Letter | 11/18/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Third Set of Information Requests. Affidavit of Michael Murphy. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811ngrd3cl.pdf |
| Response to DPU | 11/18/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Third Set of Information Requests. Affidavit of Michael Murphy. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811ngrd3.pdf |
| Jeanne Lloyd Affidavit | 11/18/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Third Set of Information Requests. Affidavit of Michael Murphy. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811ngrd3af.pdf |
| IR Attachment 3-4 | 11/18/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department's Third Set of Information Requests. Affidavit of Michael Murphy. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811ngrd3at.xlsx |
| Cover Letter | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3cl.pdf |
| Certificate of Service | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3cs.pdf |
| Affidavit - Ed Davis | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3af.pdf |
| Response to Q-DPU3-005 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-5.pdf |
| Baumann Affidavit | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3af2.pdf |
| Response to Q-DPU3-001 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-1.pdf |
| Response to Q-DPU3-002 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-2.pdf |
| Response to Q-DPU3-003 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-3.pdf |
| Response to Q-DPU3-004 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-4.pdf |
| Attachment to Q-DPU3-004 | 11/18/2011 | Responses of Western Massachusetts Electric Company to the Department's Third Set of Information Requests. Affidavits of Edward A. Davis and Robert A. Baumann. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811wmrd3-4a.xlsx |
| Response to DPU's 3rd set of IR | 11/18/2011 | Responses of NSTAR Electric Company to the Department's Third Set of Information Requests. Affidavits of Elizabeth M. Carloni and Susan Romer. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/111811nstrd3.pdf |
| AG Notice of Withdrawal | 11/9/2011 | Withdrawal of Counsel on behalf of the Attorney General. By David A. Cetola. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/11911agwdcn.pdf |
| DPU's 3rd set of IR | 11/4/2011 | Department of Public Utilities' Third Set of Information Requests to: Fitchburg Gas and Electric Light Company, d/b/a Unitil; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; NSTAR Electric Company; and Western Massachusetts Electric Company. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/11411dpuir3.pdf |
| Attachment 3-4 | 11/4/2011 | Department of Public Utilities' Third Set of Information Requests to: Fitchburg Gas and Electric Light Company, d/b/a Unitil; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; NSTAR Electric Company; and Western Massachusetts Electric Company. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/11411dpuir3a.xlsx |
| BPVS Comments | 10/12/2011 | Comments of Berkshire PhotoVoltaic Services. By Christopher Derby Kilfoyle. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211bpvcom.pdf |
| Reply Comments of the Distribution Companies | 10/12/2011 | Reply Comments on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company, and Western Massachusetts Electric Company (the "Distribution Companies"). DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211dstrpcm.pdf |
| Certificate of Service | 10/12/2011 | Reply Comments on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company, and Western Massachusetts Electric Company (the "Distribution Companies"). DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211dstrpcs.pdf |
| AG Reply Comments | 10/12/2011 | Reply Comments on behalf of the Attorney General. By Danielle Rathbun. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211agrpcm.pdf |
| Reply Comments | 10/12/2011 | Reply Comments on behalf of The Cape Light Compact and The Cape & Vineyard Electric Cooperative, Inc. By Audrey A. Eidelman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211clcrpcm.pdf |
| My Generation Energy Reply Comments | 10/12/2011 | Reply Comments of My Generation Energy, Inc. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/101211mgerpcm.pdf |
| AG's Initial Comments | 10/4/2011 | Letter on behalf of Attorney General informing Department that AG has no initial comments on the Order and the Department's proposed systen of assurance of net meeting eligibility but reserves the right to respond to issues raised by other parties in her Reply Comments. By Danielle Rathbun. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-initial.pdf |
| Palmer Capital Comments | 10/4/2011 | Comments of Palmer Capital Corporation. By Gordon L. Deane, President. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comments-pc.pdf |
| Comments of My Generation Energy | 10/4/2011 | Comments of My Generation Energy, Inc. on the Proposed Regulations to Implement a System of Assurance of Net Metering Eligibilty. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comments-me.pdf |
| Joint Distribution Company Comments | 10/4/2011 | Comments on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company, and Western Massachusetts Electric Company (the "Distribution Companies"). DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comments-dc.pdf |
| Comments | 10/4/2011 | Comments of the Renewable Resource Development Coalition. By Mary Beth Gentleman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comments-rr.pdf |
| Comments of CVEC & CLC | 10/4/2011 | Comments of The Cape Light Company and The Cape & Vinyard Electric Cooperative, Inc. pursuant to the Order in a Proposed System of Assurance of Net Metering issued by the Department of Public Utilities on September 13, 2011. By Rebecca F. Zachas. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comments.pdf |
| Comments of the DOER | 10/4/2011 | Comments of the Department of Energy Resources. By Courtney Feeley Karp, Esq. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20111004-comm-doer.pdf |
| Comments | 9/22/2011 | Comments on behalf of the Attorney General in response to Comments of TransCanada Power Marketing Ltd. By Danielle C. Rathbun. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20110922-comments.pdf |
| CLC Response to TransCanada Comments | 9/22/2011 | Comments of The Cape Light Compact in response to Comments of TransCanada Power Marketing Ltd. By Rebecca F. Zachas. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/92211cpcom.pdf |
| IREC Response to TransCanada Comments | 9/22/2011 | Comments of Interstate Renewable Energy Council in response to Comments of TransCanada Power Marketing Ltd. By Joseph F. Wiedman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20110922-response.pdf |
| Comments | 9/22/2011 | Comments of the Distribution Companies (Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric and Western Massachusetts Electric Company) in response to Comments of TransCanada Power Marketing Ltd. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20110922-comments1.pdf |
| Certificate of Service | 9/22/2011 | Comments of the Distribution Companies (Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric and Western Massachusetts Electric Company) in response to Comments of TransCanada Power Marketing Ltd. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/20110922-cert.pdf |
| Order | 9/13/2011 | ORDER ON PROPOSED SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/91311dpuord.pdf |
| Appendix A | 9/13/2011 | ORDER ON PROPOSED SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/91311dpuorda.pdf |
| Appendix B | 9/13/2011 | ORDER ON PROPOSED SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/91311dpuordb.pdf |
| Memorandum | 9/9/2011 | Hearing Officer memorandum regarding Responses to Comments of TransCanada Power Marketing Ltd. By Laura Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/9911dpumem.pdf |
| TransCanada Comments | 9/7/2011 | Comments of TransCanada Power Marketing Ltd. By Robert Ruddock. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/9711tcndcom.pdf |
| DPU-1-5 (revised) | 7/22/2011 | NSTAR Electric Company's revised response to DPU-1-5. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/72211nstrvd1-5.pdf |
| Cover Letter | 7/22/2011 | NSTAR Electric Company's revised response to DPU-1-5. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/72211nstrvdcl.pdf |
| NMRS Technical Conference Procedural Notice | 7/22/2011 | Notice of Technical Conference, to be held on October 5, 2011 at 10 a.m., at the Department's offices. By Benjamin N. Spruill, Hearing Officer. DPU 10-138 / 10-152 / 10-162 / 10-169 / 11-11 | http://www.env.state.ma.us/dpu/docs/electric/10-138/72211dpunt.pdf |
| Responses | 7/6/2011 | Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's Second Set of Information Requests. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7611fgrd2.pdf |
| Responses | 7/5/2011 | Responses of National Grid to the Department's Second Set of Information Requests. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511ngrd2.pdf |
| Responses | 7/5/2011 | Responses of NSTAR Electric Company to the Department's Second Set of Information Requests. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511nstrd2.pdf |
| Attachment to Q-DPU2-005 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-5a.pdf |
| Response to Q-DPU2-006 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-6.pdf |
| Response to Q-DPU2-002 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-2.pdf |
| Response to Q-DPU2-003 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-3.pdf |
| Attachment to Q-DPU2-003 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-3a.pdf |
| Response to Q-DPU2-004 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-4.pdf |
| Attachment to Q-DPU2-004 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-4a.pdf |
| Response to Q-DPU2-005 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-5.pdf |
| Cover Letter | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2lt.pdf |
| Certificate of Service | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2cs.pdf |
| Affidavit - Ed Davis | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2af1.pdf |
| Affidavit - Jen Schilling | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2af2.pdf |
| Response to Q-DPU2-001 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-1.pdf |
| Attachment to Q-DPU2-001 | 7/5/2011 | Responses of Western Massachusetts Electric Company to the Department's Second Set of Information Requests. By Donald H. Wells, Jr. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/7511wmrd2-1a.pdf |
| DPU's 2nd set of IR | 6/20/2011 | Department of Public Utilities' Second Set of Information Requests to: Fitchburg Gas and Electric Light Company, d/b/a Unitil; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; NSTAR Electric Company; and Western Massachusetts Electric Company. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/62011dpuir2.pdf |
| Joint Comments | 6/14/2011 | Comments on behalf of: The Cape Light Compact and Cape and Vineyard Electric Cooperative, Inc.; Massachusetts Net Metering Coalition; and Renewable Resource Development Coalition. By Audrey A. Eidelman, Esq.; Larry Chretien; and Mary Beth Gentleman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/61411clcjntcm.pdf |
| Letter: DPU Scope of Other Governmental Entity | 6/10/2011 | Response on behalf of the Cape Light Compact and the Cape & Vineyard Electric Cooperative, Inc. to the Department's request for information made at the Technical Conference held on May 16, 2011. By Jeffrey Bernstein and Audrey Eidelman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/61011clclt.pdf |
| Memorandum | 5/16/2011 | Memorandum regarding Updates to Panelists for Technical Conference, today, Monday, May 16, 2011. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/51611dpumem.pdf |
| Memorandum | 5/13/2011 | Memorandum regarding a change to the Joint Proposal panel at the Technical Conference. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/51311dpumem.pdf |
| Memorandum | 5/12/2011 | Memorandum regarding Questions for Technical Conference on Monday, May 16, 2011. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/51211dpumem.pdf |
| Notice of Technical Conference | 5/6/2011 | Notice of Technical Conference, to be held on Monday, May 16, 2011, 1:30 p.m. to 4:30, at the Department's offices at One South Station, 5th Floor, Boston, MA 02110. By Laura C. Bickel, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/5611dpunttc.pdf |
| | 4/26/2011 | Reassignement of Hearing Officer, Laura Bickel. By Chair Berwick and Commissioner Westbrook. DPU 11-11 | |
| Data Presentation by DPU | 4/25/2011 | Presentation by DPU staff: Information Reporting and Tracking. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/42511dpuprs.xlsx |
| PowerPoint presentation | 4/25/2011 | PowerPoint presentation by DPU staff: Net Metering Queue. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/42511dpupprs.pptx |
| Comments of Christopher Derby Kilfoyle | 4/20/2011 | Comments of Berkshire Photovoltaic Services. By Christopher Derby Kilfoyle. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/42011cdrcm.pdf |
| Supplemental Comments | 4/19/2011 | Supplemental Comments on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company, and Western Massachusetts Electric Company (collectively, the "Distribution Companies"). By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41911dcmn.pdf |
| Joint Proposal | 4/19/2011 | Joint Proposal of the Cape Light Compact and Cae & Vineyard Electric Cooperative, Inc., the Massachusetts Net Metering Coalition, and Renewable Resource Development Coalition entitled "Assurance of Net Metering Tariff Access." By Audrey A. Eidelman, Larry Chretien, Mary Beth Gentleman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41911clcjp.pdf |
| Responses | 4/13/2011 | Comments of My Generation Energy, Inc. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41311mgecm.pdf |
| Notice of Technical Conference | 4/11/2011 | Notice of Technical Conference to be held on Monday, April 25, 2011. By Laura C. Bickel, Hearing Officer, DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41111dpumem.pdf |
| Att. A IR summary | 4/11/2011 | Notice of Technical Conference to be held on Monday, April 25, 2011. By Laura C. Bickel, Hearing Officer, DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41111dpumema.xlsx |
| Att. B Rate Class NMC Calculation | 4/11/2011 | Notice of Technical Conference to be held on Monday, April 25, 2011. By Laura C. Bickel, Hearing Officer, DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/41111dpumemb.xlsx |
| Memorandum | 4/5/2011 | Memorandum: New Deadline for Request for Revised Straw Proposals for Net Metering Queue. By Shaela McNulty Collins, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/4511dpudl.pdf |
| Memorandum | 3/31/2011 | Memorandum: Request for Revised Straw Proposals for Net Metering Queue. By Shaela McNulty Collins, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/33111dpurq.pdf |
| Solventerra Net Metering Comments | 3/18/2011 | Comments of Solventerra, LLC in response to the Request for Straw Proposals for a Net Metering Queue. By Roger M. Freeman. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/31811slvcom.pdf |
| My Generation Energy Response | 3/18/2011 | Comments on behalf of My Generation Energy. By Michael Stone. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/31811mgcom.pdf |
| Distribution Companies Comments | 3/16/2011 | Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company and Western Massachusetts Electric Company (collectively "Distribution Companies") submit comments in response to the Request for Straw Proposals for Net Metering. By John K. Habib. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611dcmpcom.pdf |
| Cover Letter | 3/16/2011 | Comments of the Cape Light Compact and Cape & Vineyard Electric Cooperative, Inc. in response to the Request for Straw Proposals for a Net Metering Queue. By Audrey Eidelman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611clcmlt.pdf |
| Comment | 3/16/2011 | Comments of the Cape Light Compact and Cape & Vineyard Electric Cooperative, Inc. in response to the Request for Straw Proposals for a Net Metering Queue. By Audrey Eidelman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611clcm.pdf |
| Certificate of Service | 3/16/2011 | Comments of the Cape Light Compact and Cape & Vineyard Electric Cooperative, Inc. in response to the Request for Straw Proposals for a Net Metering Queue. By Audrey Eidelman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611clcmcs.pdf |
| Statement of the MNMC, additional signors | 3/16/2011 | Email from Massachusetts Net Metering Coalition with additional signors not included on filing of 3/9/2011. By Larry Chretian. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/3911nmcsp.pdf |
| Cover Letter | 3/16/2011 | Email from Massachusetts Net Metering Coalition with additional signors not included on filing of 3/9/2011. By Larry Chretian. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/3911nmcspcl.pdf |
| RRDC Proposal | 3/16/2011 | Straw Proposal for Net Metering Tariff Access of the Renewable Resource Development Coalition. By Mary Beth Gentleman. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611rrdpr.pdf |
| Comments | 3/16/2011 | Comments of Renewable Energy Massachusetts, LLC and Syncarpha Solar, LLC RE: Request for Straw Proposals for a Net Metering. By Brian Kopperl of REM & Clifford Chapman of Syncarpha Solar. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/31611rencm.pdf |
| Email Comments | 3/11/2011 | Comments via e-mail on behalf of AgreenEnergy, LLC and Casella Waste Management on a letter received from Energy Consumers Alliance of New England. By Bill Jorgenson and Larry Chrietien. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/31111bjcom.pdf |
| | 3/9/2011 | Email from Massachusetts Net Metering Coalition, RE: statement in response to Departments request for straw proposals. By Larry Chretian. DPU 11-11 | |
| Memorandum | 3/8/2011 | Hearing Officer Memorandum regarding Request for Straw Proposals for Net Metering Queue and Notice of Technical Session to be held on March 23, 2011. By Shaela Collins, Hearing Officer. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/3811dpuntch.pdf |
| AG's Notice of Intervention | 3/2/2011 | Attorney General's Notice of Intervention and Appearances of Counsel. By Danielle C. Rathbun. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/3211agntin.pdf |
| Responses | 2/28/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid, to DPU-NG-1-2, 1-3, 1-4, 1-5 and 1-7, along with an Affidavit of Timothy R. Roughan. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22811ngrspd1.pdf |
| FG&E Responses | 2/28/2011 | Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's First Set of Information Requests: DPU 1-1 through 1-8. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22811fgerspd1.pdf |
| Attachment | 2/28/2011 | Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's First Set of Information Requests: DPU 1-1 through 1-8. By Gary Epler. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22811fgerspa.xls |
| Responses | 2/28/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid, to DPU-NG-1-1, 1-6 and 1-8. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22811ngrsp.pdf |
| Attachment DPU-NG 1-1 | 2/28/2011 | Responses of Massachusetts Electric Company and Nantucket Electric Company, each d/b/a National Grid, to DPU-NG-1-1, 1-6 and 1-8. By Brooke E. Skulley. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22811ngrspa.xls |
| Cover Letter | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmrlt.pdf |
| Certificate of Service | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmrcs.pdf |
| Affidavit | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmraf.pdf |
| Affidavit | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmrafs.pdf |
| Attachment | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmra1.xls |
| Attachment | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmra2.xls |
| Attachment | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmra3.xls |
| Responses | 2/25/2011 | Responses of Western Massachusetts Electric Company to the Department's First Set of Information Requests: DPU 1-001 through 1-008. Affidavits of Jennifer A. Schilling and Edward A. Davis. By Stephen Klionsky. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511wmrd1.pdf |
| Response to DPU's 1st set of IR | 2/25/2011 | Responses of NSTAR Electric Company to the Department's First Set of Information Requests. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511nstrd1.pdf |
| Attachment DPU-1-1 | 2/25/2011 | Responses of NSTAR Electric Company to the Department's First Set of Information Requests. By John K. Habib. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/22511nstrd1a.xls |
| DPU's 1st set of IR | 2/16/2011 | The Department's First Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, NSTAR Electric Company, Western Massachusetts Electric Company. By Shaela McNulty Collins. DPU 11-11 | http://www.env.state.ma.us/dpu/docs/electric/11-11/21611dpuir1.pdf |
| | 2/11/2011 | Assignment of Hearing Officer, Shaela Collins. DPU 11-11 | |
| Agenda | 2/8/2011 | Hearing Officer Memo sent to service list via electronic mail RE: Agenda and Topics for Technical Conference to be held February 14, 2011. By Shaela Collins, Hearing Officer. | http://www.env.state.ma.us/dpu/docs/electric/11-11/2811dpuagenda.pdf |
| Notice of Technical Conference | 2/7/2011 | Notice of Technical Conference on Net Mettering and Interconnection Inquiry. From: Chair Berwick, Commissioners Woolf and Westbrook. DPU 11-11. | http://www.env.state.ma.us/dpu/docs/electric/11-11/2711netm_tech.pdf |