TypeDocketNameSubjectSummaryFiledClosedCategory
ELECTRIC11-108MASS. ELECTRIC/NANTUCKET ELEC D/B/A NATIONAL GRIDPetition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan.EE MID-TERM MODIFICATION10/31/2011  


Docket Electronic Filings
 DescriptionDateMemoURL
Corrected 2012 MTM2/13/2013Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submits corrected 2012 mid-term mofification electric performance incentive model, a corrected copy of the 08-50 tables, and a corrected benefit screening model. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11-108-Filing-1306.pdf
Attachment2/13/2013Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submits corrected 2012 mid-term mofification electric performance incentive model, a corrected copy of the 08-50 tables, and a corrected benefit screening model. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11-108-Filing-1307.xlsx
Attachment2/13/2013Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submits corrected 2012 mid-term mofification electric performance incentive model, a corrected copy of the 08-50 tables, and a corrected benefit screening model. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11-108-Filing-1308.xlsx
Attachment2/13/2013Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submits corrected 2012 mid-term mofification electric performance incentive model, a corrected copy of the 08-50 tables, and a corrected benefit screening model. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11-108-Filing-1309.xlsx
AG's Reply Comments7/11/2012Attorney General's Reply Comments. By Matthew Saunders. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/71112agrpcm.pdf
Cover Letter7/11/2012Reply Comments of the Commonwealth of Massachusetts Department of Energy Resources. By Steven I. Venezia, Deputy General Counsel. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-108/71112doerrpcmcl.pdf
Reply Comments7/11/2012Reply Comments of the Commonwealth of Massachusetts Department of Energy Resources. By Steven I. Venezia, Deputy General Counsel. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-108/71112doerrpcm.pdf
Cover Letter7/11/2012Joint Comments of the Program Administrators. By Shaela McNulty Collins. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/71112padjcmcl.pdf
Joint Comments7/11/2012Joint Comments of the Program Administrators. By Shaela McNulty Collins. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/71112padjcm.pdf
Notice of Withdrawal6/22/2012Attorney General submits Withdrawal of Counsel. By Danielle Rathbun. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/62212agntwd.pdf
Notice of Appearance6/22/2012Attorney General submits Noice of Appearance of Counsel. By Matthew Saunders. DPU DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/62212agntap.pdf
Initial Comments6/8/2012Initial Comments on Behalf of the Office of the Attorney General. By Danielle C. Rathbun. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/6812agincm
Initial Brief6/8/2012Program Administrators submit Initial Brief along with Certificate of Service. By Shaela McNulty Collins for Emmett Lyne, Jodi K. Hanover, Kevin F. Penders, Patricia J. Crowe, Donald H. Wells, Jo Ann Bodemer, John K. Habib and Annette Tran. DPU 11-106 though DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/6812padinbf.pdf
LEAN's Initial Brief6/8/2012Low-Income Energy Assistance Network submits Initial Brief. By Jerrold Oppenhiem. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/6812leanib.pdf
Cover Letter6/7/2012Department of Energy Resources submits Initial Comments. By Steven I. Venezia. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/6712doerincl.pdf
DOER's Initial Comments6/7/2012Department of Energy Resources submits Initial Comments. By Steven I. Venezia. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/6712doerinc.pdf
Memorandum - Briefing Schedule5/24/2012Memorandum to Service Lists in D.P.U. 11-106 through D.P.U. 11-116 RE: Briefing Schedule. By Jeffrey Leupold. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/52412dpumem.pdf
Notice5/15/2012Notice on behalf of the Program Administrators informing the Department that they do not intend to sponsor a common rebuttal witness or request evidentiary hearings with respect to testimony of LEAN filed on April 3, 2012. By Emmett Lyne. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51512padnt.pdf
 5/14/2012Motion for Extension of Time to Respond to Information Requests Filed by Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116 
Attachment - ABCD lites - John Kickham5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra2.pdf
Attachment - ABCD lites - Ralph Sussman House5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra3.pdf
Attachment - ABCD lites - Spencer House5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra4.pdf
Attachment - St Helena's Cost Benefit Analysis5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra5.pdf
Attachment - DOE Meta Evalcon5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra6.pdf
Attachment - Cadmus et al eval of AMP5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra7.pdf
Responses to AG in MTM5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linrsp.pdf
Attachment - ABCD fixture sav5/14/2012RESPONSES of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network to the Attorney General First Set of Information Requests. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51412linra1.xlsx
AG's Notice Regarding Evidentiary Hearings5/14/2012Attorney General submits notice the she does not require evidentiary hearings. By Danielle Rathbun. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/51412agnt.pdf
Motion for Extension5/10/2012Motion for Extension of Time to Respond to Information Requests of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/51012limt.pdf
 5/10/2012GRANTED - Motion for Extension of Time to Respond to Information Requests of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Jeffrey Leupold, Hearing Officer. DPU 11-106 through 11-116 
 5/10/2012Memorandum RE: Procedural Schedule, adopting Attorney General's proposal of extension of date for notifying Department of the need for evidentiary hearings. By Jeffrey Leupold, Mike Wallerstein, and Jonathan Goldberg. DPU 11-106 through 11-116 
AG's Letter re Evidentiary Hearings5/4/2012Attorney General proposes that she will notify Department and Interested Parties regarding the need for evidentiary hearings within two business days of the filing of last LEAN discovery responses. By Danielle Rathbun. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/5412aglet.pdf
Notice5/4/2012Program Administrators submit notice that it is unlikely they will sponsor a common rebuttal witness or request evidentiary hearings with respect to LEAN testimony filed April 3, 2012. By Emmett E. Lyne. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/5412palt.pdf
Approval5/2/2012APPROVED - Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit Joint Motion for Approval of Partial Settlement on Scope and Offer of Partial Settlement on Scope of Proceeding. By Chair Berwick, Commissioners Westbrook and Cash. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/5212dpuaprv.pdf
Cover Letter4/20/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit Joint Motion for Approval of Partial Settlement on Scope and Offer of Partial Settlement on Scope of Proceeding. By Jodi K. Hanover. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/42012netjmtcl.pdf
Joint Motion for Partial Settlement4/20/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit Joint Motion for Approval of Partial Settlement on Scope and Offer of Partial Settlement on Scope of Proceeding. By Jodi K. Hanover. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/42012netjmt.pdf
Partial Settlement on 2012 MTMs4/20/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit Joint Motion for Approval of Partial Settlement on Scope and Offer of Partial Settlement on Scope of Proceeding. By Jodi K. Hanover. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/42012netjmtps.pdf
Procedural Schedule4/20/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit Joint Motion for Approval of Partial Settlement on Scope and Offer of Partial Settlement on Scope of Proceeding. By Jodi K. Hanover. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/42012netjmtpsc.pdf
AG's 1st set of IR4/11/2012Attorney General's First Set of Information and Document Requests to Action for Boston Community Development. By Danielle C. Rathbun. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/41112agir1.pdf
Memorandum4/6/2012Memorandum RE: Amended Procedural Schedule. By Jeffrey Leupold. DPU 11-106 through 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/4612dpumem.pdf
Testimony and Affidavit4/4/2012Testimony and Affidavit of John Wells on behalf of the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/4412litst.pdf
Cover Letter4/4/2012Joint Motion for Extension until Wednesday, April 11, 2012 of Deadline to File Testimony. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/4212ntwjmtcl.pdf
Motion to Extend Testimony Date4/4/2012Joint Motion for Extension until Wednesday, April 11, 2012 of Deadline to File Testimony. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/4212ntwjmt.pdf
Cover Letter4/3/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit the attached Stipulation Agreement, along with a Joint Motion for Approval of Stipulation Agreement. By Jodi K. Hanover. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/20120403-letter.pdf
Joint Motion for Stipulation4/3/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit the attached Stipulation Agreement, along with a Joint Motion for Approval of Stipulation Agreement. By Jodi K. Hanover. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/20120403-motion.pdf
Stipulation on 2012 MTMs4/3/2012Bay State Gas Company d/b/a Columbia Gas of Massachusetts, The Berkshire Gas Company, Boston Gas Company and Colonial Gas Company d/b/a National Grid, Cape Light Compact, Fitchburg Gas and Electric Light Company d/b/a Unitil, Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid, New England Gas Company, NSTAR Electric Company and NSTAR Gas Company, Western Massachusetts Electric Company, Office of the Attorney General, Department of Energy Resources, and the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and Low-Income Energy Affordability Network, and Environment Northeast submit the attached Stipulation Agreement, along with a Joint Motion for Approval of Stipulation Agreement. By Jodi K. Hanover. DPU 11-106 through DPU 11-116.http://www.env.state.ma.us/dpu/docs/electric/11-106/20120403-stipulation.pdf
LEAN-Comm-2-8 H4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8h.xls
LEAN-Comm-2-8 I4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8i.xls
LEAN-Comm-2-8 B4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8b.xlsx
LEAN-Comm-2-8 C4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8c.xlsx
LEAN-Comm-2-8 D4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8d.xlsx
LEAN-Comm-2-8 E4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8e.xlsx
LEAN-Comm-2-8 F4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8f.xls
LEAN-Comm-2-8 G4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8g.xlsx
Responses to LEAN Comm Set 24/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2.pdf
LEAN-Comm-2-8 A4/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Second Set of Common Information Requests. Affidavits of Carl V. Swanson, Paul Chernick, James Richard Hornby, Jeremy Newberger, John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle2-8a.xlsx
Responses to Lean Common Set 34/2/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to LEAN's Third Set of Common Information Requests. Affidavits of John Gregory Clendenning and Lynn Westerlind. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/4212ngrle3.pdf
Affidavit3/30/2012Affidavit of Carol S. White on behalf of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/33012ngaff.pdf
Responses to DPU Common Set 33/29/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit reponses to the Department of Public Utilities Third Set of Common Information Requests along with the Affidavit of Carol S. White. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/32912ngrd3.pdf
Cover Letter3/26/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's Second Set of Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/32612ngrag2cl.pdf
Responses to AG's 2nd set of IR3/26/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's Second Set of Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/32612ngrag2.pdf
Attachment AG NGridElectric-2-13/26/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's Second Set of Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/32612ngrag2a.xls
Attachment AG NGridElectric-2-13/26/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's Second Set of Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/32612ngrag2b.xls
Affidavit of Carol S. White3/23/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit Affidavit of Carol S. White which was not included in March 8, 2012 responses to Attorney General's Second Set of Information Requests. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/32312ngaf.pdf
AG-Comm-3-1b (Att.)3/22/2012RESPONSES of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Second Set of Information Requests and the Attorney General's Third Set of Common Information Requests. Also, Affidavit of Carol White. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/32212ngrag3-1b.xls
Responses to Information Requests3/22/2012RESPONSES of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Second Set of Information Requests and the Attorney General's Third Set of Common Information Requests. Also, Affidavit of Carol White. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/32212ngrsp.pdf
AG-Comm-3-1a (Att.)3/22/2012RESPONSES of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Department of Public Utilities Second Set of Information Requests and the Attorney General's Third Set of Common Information Requests. Also, Affidavit of Carol White. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/32212ngrag3-1a.xls
Granted motion to extend discovery deadline3/19/2012GRANTED - Motion of the Program Administrators for Extension of Deadline until March 30, 2012 to File Responses to Information Requests of the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Mike Wallerstein, Hearing Officer. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31912dpugrmt.pdf
Cover Letter3/19/2012Motion of the Program Administrators for Extension of Deadline until March 30, 2012 to File Responses to Information Requests of the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31912padmtcl.pdf
Motion to Extend Deadline3/19/2012Motion of the Program Administrators for Extension of Deadline until March 30, 2012 to File Responses to Information Requests of the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31912padmt.pdf
DPU's 3rd set of Common IR3/15/2012Department's Third Common Set of Information Requests to NSTAR Electric Company; NSTAR Gas Company; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; Fitchburg Gas and Electric Light Company d/b/a Unitil; Western Massachusetts Electric Company; Bay State Gas Company d/b/a Columbia Gas of Massachusetts; The Berkshire Gas Company; and New England Gas Company. By Mike Wallerstein, Hearing Officer. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31512dpuircm3.pdf
Responses to AG's 1st set of IR3/13/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's First Set of Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/31312ngrag1.pdf
AG's 2nd set of IR3/12/2012Attorney General's Second Set of Information and Document Requests to Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid and Certificate of Service. By Danielle Rathbun. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/31212agir2.pdf
LEAN's 3rd set of Discovery3/12/2012Third Set of Common Data Requests of the Low-Income Energy Affordability Network et al. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31212leandr.pdf
NEI comments from PAs and LEAN matrix3/12/2012Third Set of Common Data Requests of the Low-Income Energy Affordability Network et al. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31212leandra.pdf
NEI comments from PAs and LEAN matrix3/12/2012Third Set of Common Data Requests of the Low-Income Energy Affordability Network et al. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/31212leandrb.xlsx
Granted - AG's Motion3/12/2012GRANTED: Attorney General's Motion for Extension of Discovery Deadline. By Benjamin Spruill. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/31212dpugrmt.pdf
AG's Motion for Extension3/12/2012Attorney General's Motion for Extension of Discovery Deadline and Certificate of Service. By Danielle Rathbun. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/31212agmtex.pdf
AG's 3rd set of Common IR and Document Requests3/8/2012Attorney General's Third Set of Common Information and Document Requests, and Certificate of Service. By Danielle Rathbun. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/3812agir3.pdf
Responses to AG Common Set 13/8/2012Responses of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid to the Attorney General's First Set of Common Information Requests. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/3812ngragcm1.pdf
DPU's 2nd set of common IR3/8/2012Department's Second Common Set of Information Requests to NSTAR Electric Company; NSTAR Gas Company; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; Fitchburg Gas and Electric Light Company d/b/a Unitil; Western Massachusetts Electric Company; Bay State Gas Company d/b/a Columbia Gas of Massachusetts; The Berkshire Gas Company; and New England Gas Company. By Mike Wallerstein, Hearing Officer. DPU 11-106 through 11-115http://www.env.state.ma.us/dpu/docs/electric/11-106/3812dpuir2cm.pdf
Responses to AG's 2nd set of Common IR3/8/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to Attorney General's Second Set of Common Information Requests along with Affidavit of Jeanne Lloyd. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/3912ngrag2.pdf
Response to DPU's 1st set of Common IR3/7/2012Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid submit responses to the Department of Public Utilities First Set of Common Information Requests along with the Affidavit of Carol S. White. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/3712ngrdcm1.pdf
Motion to Extend Deadline re AG-Comm3/6/2012Motion of the Program Administrators for Extension of Deadline until Thursday, March 8, 2012 to File Responses to Information Requests. By John Habib. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/3612padmtn.pdf
GRANTED - Motion3/6/2012GRANTED - Motion of the Program Administrators for Extension of Deadline until Thursday, March 8, 2012 to File Responses to Information Requests. By Benjamin Spruill, Hearing Officer. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/3612dpugrmt.pdf
LEAN 2nd set of Common Data Requests3/2/2012Second Set of Common Data Requests of the Low-Income Energy Affordability Network et al. By Jerrold Oppenheim. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/3212leandr2.pdf
AG's 1st set of IR2/28/2012Attorney General's First Set of Information and Document Requests. By Danielle Rathbun. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/22812agir1.pdf
AG Common Discovery Set 22/23/2012Attorney General's Second Set of Common Information and Document Requests. By Danielle Rathbun. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/22312agir2cm.pdf
DPU's 1st set of Common IR2/22/2012Department's First Common Set of Information Requests to NSTAR Electric Company; NSTAR Gas Company; Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; Fitchburg Gas and Electric Light Company d/b/a Unitil; Western Massachusetts Electric Company; Bay State Gas Company d/b/a Columbia Gas of Massachusetts; The Berkshire Gas Company; and New England Gas Company. By Mike Wallerstein, Hearing Officer. DPU 11-106 through 11-115http://www.env.state.ma.us/dpu/docs/electric/11-106/22212dpuir1cm.pdf
AG's 1st set of Common IR2/17/2012Attorney General's First Set of Common Information and Document Requests. By Danielle Rathbun. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/21712agircm1.pdf
Procedural schedule and ground rules2/8/2012Procedural Schedule and Ground Rules. By Jeffrey Leupold, Hearing Officer. DPU 11-108 / 11-110 / 11-112 / 11-116http://www.env.state.ma.us/dpu/docs/electric/11-108/2812dpupsch.pdf
 1/18/2012TRANSCRIPT - Public Hearing and Procedural Conference, held on Thursday, January 5, 2012 at 2 p.m., at the Department's offices. Pages 1-13. DPU 11-106 through 11-116 
Responses1/12/2012National Grid's responses to the First Set of Information Requests of LEAN. Affidavits of Carol White, Jeremy Newberger and John Gregory Clendenning. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11212ngrlean1.pdf
Attachment LEAN-1-5 (a)1/12/2012National Grid's responses to the First Set of Information Requests of LEAN. Affidavits of Carol White, Jeremy Newberger and John Gregory Clendenning. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11212ngrlean1a.xls
Attachment LEAN-1-5 (b)1/12/2012National Grid's responses to the First Set of Information Requests of LEAN. Affidavits of Carol White, Jeremy Newberger and John Gregory Clendenning. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11212ngrlean1b.xls
 1/5/2012Return of Service on Behalf of Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid. By Karen Moriarty. DPU 11-108. 
Cover Letter12/29/2011Petition for Leave to Intervene as a Limited Participant of Community Labor United, Inc., along with a Notice of Appearance and Certificate of Service. By Staci Rubin. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/122911clcptcl.pdf
CLU Petition to Intervene12/29/2011Petition for Leave to Intervene as a Limited Participant of Community Labor United, Inc., along with a Notice of Appearance and Certificate of Service. By Staci Rubin. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/122911clcptn.pdf
Trans. Letter - Motion To Intervene12/23/2011Petition to Intervene of The Energy Network, along with Appearance of Counsel and Certificate of Service. By Robert Ruddock. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/122311tenptcl.pdf
Motion To Intervene12/23/2011Petition to Intervene of The Energy Network, along with Appearance of Counsel and Certificate of Service. By Robert Ruddock. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/122311tenptn.pdf
Certificate of Service12/23/2011Petition to Intervene of The Energy Network, along with Appearance of Counsel and Certificate of Service. By Robert Ruddock. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/122311tenptcs.pdf
Appearance Of Counsel12/23/2011Petition to Intervene of The Energy Network, along with Appearance of Counsel and Certificate of Service. By Robert Ruddock. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-106/122311tenptap.pdf
Responses to DPU's 2nd set of IR12/23/2011Massachusetts Electric Company and Nantucket Electric Company d/b/a National Grid's responses to the Department's Second Set of Information Requests. Affidavit of Carol White. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/122311ngrd2.pdf
Cover Letter12/22/2011Petition to Intervene of Environment Northeast and Appearance of Counsel by Jeremy C. McDiarmid. DPU 11-106 / 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/12222011-letter.pdf
Pettition to Intervene12/22/2011Petition to Intervene of Environment Northeast and Appearance of Counsel by Jeremy C. McDiarmid. DPU 11-106 / 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/12222011-petition.pdf
Petition to Intervene12/15/2011Petition to Intervene of Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 11-106; 11-107; 11-108; 11-109; 11-110; 11-111; 11-112; 11-113; 11-114; 11-115; 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/121511linptn.pdf
Cover Letter12/14/2011Department of Energy Resources files: (1) the Energy Efficiency Advisory Council's Resolution of November 8, 2011 Regarding the Program Administrators' Proposed 2012 Mid-Term Modifications; and (2) Report to the Energy Efficiency Advisory Council on 2012 Mid-Term Modifications Proposed by the Massachusetts Electric and Gas Program Administrators (Nov. 4, 2011, Revised Dec. 5, 2011). By Steven I. Venezia. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/121411doerrpcl.pdf
Report12/14/2011Department of Energy Resources files: (1) the Energy Efficiency Advisory Council's Resolution of November 8, 2011 Regarding the Program Administrators' Proposed 2012 Mid-Term Modifications; and (2) Report to the Energy Efficiency Advisory Council on 2012 Mid-Term Modifications Proposed by the Massachusetts Electric and Gas Program Administrators (Nov. 4, 2011, Revised Dec. 5, 2011). By Steven I. Venezia. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/121411doerrpt.pdf
EEAC Resolution12/14/2011Department of Energy Resources files: (1) the Energy Efficiency Advisory Council's Resolution of November 8, 2011 Regarding the Program Administrators' Proposed 2012 Mid-Term Modifications; and (2) Report to the Energy Efficiency Advisory Council on 2012 Mid-Term Modifications Proposed by the Massachusetts Electric and Gas Program Administrators (Nov. 4, 2011, Revised Dec. 5, 2011). By Steven I. Venezia. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/121411doerrps.pdf
Response to DPU's 1st set of IR12/12/2011RESPONSE on Behalf of Boston Gas Company and Colonial Gas Company d/b/a National Grid to the Department's First Set of Information Requests. By Patricia Crowe. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/121211ngrd1.pdf
DPU's 2nd set of IR12/9/2011Department's Second Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid. By Jeffrey Leupold. DPU 11-108.http://www.env.state.ma.us/dpu/docs/electric/11-108/12911dpuir2.pdf
 12/7/2011Order of Notice, and Notice of Filing and Public Hearing, to be held on January 5, 2012 at 2 p.m. By Mark D. Marini, Secretary. DPU 11-108 
 11/28/2011Department's First Set of Information Requests to Massachusetts Electric Company and Nantucket Electric Company, d/b/a National Grid; Fitchburg Gas and Electric Light Company; Western Massachusetts Electric Company; and The Cape Light Compact. By Jeffrey M. Leupold, Hearing Officer. DPU 11-108, 11-110, 11-112, 11-116 
 11/15/2011Hearing Officer Assignment to Jeff Leupold. By Chair Berwick and Commissioner Cash. DPU 11-108 
Cover Letter -Revised Filing11/4/2011Updated Version of Exhibit D, Attachment 1 of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan on Behalf of Massachusetts Electric Company and Nantucket Company d/b/a National Grid. By Karen Moriarty. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11411ngrvexl.pdf
Exh D Att 1 - Metrics ELEC (revised)11/4/2011Updated Version of Exhibit D, Attachment 1 of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan on Behalf of Massachusetts Electric Company and Nantucket Company d/b/a National Grid. By Karen Moriarty. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/11411ngrvex.pdf
AG Notices of Intervention and Appearances11/4/2011Attorney General's Notice of Intervention and Appearance of Counsel. By Danielle C. Rathbun. DPU 11-106 through 11-116http://www.env.state.ma.us/dpu/docs/electric/11-106/11411agntap.pdf
Cover Letter11/2/2011Petition to Intervene, Notice of Appearance of Counsel, Certificate of Service, on Behalf of Massachusetts Department of Energy Resources (DOER). By Steven I. Venezia. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-106/11211doerptcl.pdf
DOER Petition11/2/2011Petition to Intervene, Notice of Appearance of Counsel, Certificate of Service, on Behalf of Massachusetts Department of Energy Resources (DOER). By Steven I. Venezia. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-106/11211doerptn.pdf
Petition10/31/2011Petition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/103111ngptn.pdf
Exh B Att 110/31/2011Petition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/103111ngptexb.xls
Exh D Att 2 - PI Model10/31/2011Petition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/103111ngptexd.xls
Exh I App. 3 National Grid Electric MTM10/31/2011Petition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/103111ngptexi.xls
Exh I App. 3 National Grid Electric 2012 PI10/31/2011Petition of Massachusetts Electric Company and Nantucket Company d/b/a National Grid for Approval by the Department of Public Utilities of the Companies' Mid-Term Modifications to their Three-Year Energy Efficiency Plan. By Patricia Crowe. DPU 11-108http://www.env.state.ma.us/dpu/docs/electric/11-108/103111ngptexi1.xls





Docket Service List
FirstLastCompanyAddressCityStateZipEmailFAXPhone
StaciRubinAlternatives for Community & Environment, Inc.2181 Washington Street, Suite 301RoxburyMA02119staci@ace-ej.org 617-442-3343
Jo AnnBodemer, Esq.BCK Law, P.C.One Gateway Center, Suite 809NewtonMA02458jbodemer@bck.com617-244-9550617-244-9500
JerroldOppenheim, Esq.Democracy and Regulation57 Middle StreetGloucesterMA01930JerroldOpp@Yahoo.com978-283-0957978-283-0897
StevenVenezia, Esq.Department of Energy Resources100 Cambridge Street, Suite 1020BostonMA02114steven.venezia@state.ma.us617-727-0030617-727-4732
JeremyMcDiarmid, Esq.Environment Northeast101 Tremont Street, Suite 401BostonMA02108jmcdiarmid@env-ne.org617-373-9494617-742-0054
PatriciaCrowe, Esq.National Grid40 Sylvan RoadWalthamMA02451patricia.crowe@nationalgrid.com781-907-5701781-907-1848
NancyBrockway, Esq.NBrockway & Associates10 Allen StreetBostonMA02131Nbrockway@aol.com 617-645-4018
MatthewSaunders, Esq.Office of the Attorney GeneralOne Ashburton PlaceBostonMA02108Matthew.Saunders@state.ma.us 617-727-2200
RobertRuddock, Esq.Smith, Segel & Ruddock50 Congress Street, Suite 500BostonMA02109rruddock@srhpublicpolicy.com617-523-7171617-523-0600