Docket:
Docket Details
TypeDocketNameSubjectSummaryFiledClosedCategory
GAS10-150FITCHBURG GAS & ELECTRIC LIGHT COMPANYPetition of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Public Utilities for review and approval of its mid-term modification to its 2011 Energy Efficiency Programs.2011 EE MID TERM MODIFICATION11/1/2010  


Docket Electronic Filings
 DescriptionDateMemoURL
Notice of Appearance6/22/2012Attorney General submits Notice of Appearance of Counsel. By Matthew Saunders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-140/62212agntap.pdf
Notice of Withdrawal6/22/2012Attorney General submits Withdrawal of Counsel. By Danielle Rathbun. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-140/62212agntwd.pdf
 3/27/2012Reassignment to Jeffrey Leupold, Hearing Officer. By Chair Berwick and Commissioner Westbrook. DPU 10-150 
 9/6/2011TRANSCRIPT - Volume A, Pages 1-31 of Public Hearing held at the Department of Public Utilities, One South Station, Boston, on Monday, August 29, 2011. DPU 10-140 - 10-150. 
Return of Service8/30/2011Return of Service and Proof of Publication on behalf of Fitchburg Gas & Electric Light Company d/b/a/ Unitil. By Kevin F. Penders, Esq. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/82911fgrtsv.pdf
 8/19/2011Attorney General's Notice of Intervention and Appearance of Counsel. By Danielle Rathbun. DPU 10-150. 
Notice & Order of Notice8/3/2011Order of Notice, and Notice of Filing and Rescheduled Public Hearing, to be held on August 29, 2011 at 1:30 p.m. at the Department's offices, One South Station, Boston, MA. By Mark D. Marini, Secretary. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/8311dpuordnt.pdf
Cover Letter7/15/2011Reply Comments of the Massachusetts Department of Energy Resources. By Steven I. Venezia. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511doerrpcl.pdf
DOER Reply Comment7/15/2011Reply Comments of the Massachusetts Department of Energy Resources. By Steven I. Venezia. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511doerrpcm.pdf
Certificate of Service7/15/2011Reply Comments of the Massachusetts Department of Energy Resources. By Steven I. Venezia. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511doerrpcs.pdf
LEAN Comments7/15/2011Comments by Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511licom.pdf
Cover Letter7/15/2011Reply Comments of the Program Administrators. By Stacey M. Donnelly, John K. Habib, Donald Wells, Kevin Penders, Emmett E. Lyne, Jo Ann Bodemer. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511padrcl.pdf
Joint PA Reply Comments7/15/2011Reply Comments of the Program Administrators. By Stacey M. Donnelly, John K. Habib, Donald Wells, Kevin Penders, Emmett E. Lyne, Jo Ann Bodemer. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511padrcm.pdf
Cover Letter7/15/2011Reply Comments of Environment Northeast. By Danah A. Tench. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511enerpcl.pdf
ENE Reply Comments on Settlement Agreement7/15/2011Reply Comments of Environment Northeast. By Danah A. Tench. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511enerp.pdf
Certificate of Service7/15/2011Reply Comments of Environment Northeast. By Danah A. Tench. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/71511enerpcs.pdf
Cover Letter7/1/2011Comments on behalf of the Attorney General. By Danielle C. Rathbun. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/7111agcomcl.pdf
AG's Comments7/1/2011Comments on behalf of the Attorney General. By Danielle C. Rathbun. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/7111agcom.pdf
CLU's Comments6/3/2011Comments of Community Labor United on Mid-Term Modification Settlement. By Staci M. Rubin. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/6311clucom.pdf
AG's Comments6/3/2011Letter on behalf of the Attorney General requesting a conference call to determine a procedural schedule. By Danielle C. Rathbun. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/6311agcom.pdf
Memorandum5/24/2011Memorandum regarding Procedural Schedule. By Jeffrey M. Leupold, Benjamin N. Spruill, Hearing Officers. DPU 10-140 through 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/52411dpumem.pdf
Responses to AG's 5th set of IR5/20/2011Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General's Fifth Set of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/52011fgrag5.pdf
AG's 5th set of Common IR5/6/2011Attorney General's Fifth Set of Common Information and Document Requests. By Danielle C. Rathbun. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/5611agirc5.pdf
Cover Letter4/29/2011Reaffirmation of Comments Made by Commonwealth of Massachusetts Department of Energy Resources in Support of the Memorandum of Agreement. By Steven I. Venezia. DPU 10-140, 10-141, 10-143, 10-144, 10-145 and 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/42911doerrecl.pdf
Filing4/29/2011Reaffirmation of Comments Made by Commonwealth of Massachusetts Department of Energy Resources in Support of the Memorandum of Agreement. By Steven I. Venezia. DPU 10-140, 10-141, 10-143, 10-144, 10-145 and 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/42911doerre.pdf
Certificate of Service4/29/2011Reaffirmation of Comments Made by Commonwealth of Massachusetts Department of Energy Resources in Support of the Memorandum of Agreement. By Steven I. Venezia. DPU 10-140, 10-141, 10-143, 10-144, 10-145 and 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/42911doerrecs.pdf
Memorandum4/22/2011Memorandum to Service Lists re: Request for Comments by 5:00pm on April 29, 2011. By Jeffrey M. Leupold, Benjamin N. Spruill, Hearing Officers. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/42211dpumem.pdf
Unitil Exh H Revised4/15/2011Revised Exhibit H, which consists of further updated Company-specific DPU 08-50 Tables, filed on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/41511fgervh.pdf
Cover Letter4/15/2011Comments of the Commonwealth of Massachusetts Department of Energy Resources. By Stephen I. Venezia. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/41511doercml.pdf
DOER Comments4/15/2011Comments of the Commonwealth of Massachusetts Department of Energy Resources. By Stephen I. Venezia. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/41511doercm.pdf
 4/15/2011Program Administors file: (1) Joint Motion for Approval of Memorandum of Agreement, (2) Resolution of the Energy Efficiency Advisory Council Regarding the 2011 Program Administrators' Proposed Mid-Term Modifications and EEAC Consultant Report; (3) Memorandum of Agreement. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150 
Responses to DPU's 3rd set of IR4/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Department of Public Utilities Third Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgerd3.pdf
Responses to AG's 4th set of IR4/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Attorney General's Fourth Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgerag4.pdf
Unitil Response to DPU Common 14/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Department of Public Utilities First Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgrdc1.pdf
Responses to AG's 3rd set of IR4/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Attorney General's Third Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgerag3.pdf
Attachment AG-Comm-3-21 20114/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Attorney General's Third Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgerag3a.xls
Response to DPU's 2nd set of IR4/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Department of Public Utilities Second Set of Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/33011fgerd2.pdf
Unitil Response to DPU Common 24/6/2011Fitchburg Gas and Electric Light Company d/b/a Unitil submit responses to the Department of Public Utilities Second Set of Common Information Requests. By Kevin F. Penders. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/4611fgrdc2.pdf
Withdrawal4/5/2011Withdrawal on behalf of the Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association, and the Low-Income Energy Affordability Network of their First Common Set of Data Requests. By Jerrold Oppenheim. DPU 10-140/10-141/10-142/10-143/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/4511linwd.pdf
Cover Letter4/1/2011Department of Energy Resources' Motion for Extension of Time to submit Pre-filed Testimony until April 15, 2011. By Steven I. Venezia. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/4111doermtcl.pdf
Motion4/1/2011Department of Energy Resources' Motion for Extension of Time to submit Pre-filed Testimony until April 15, 2011. By Steven I. Venezia. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/4111doermtn.pdf
Certificate of Service4/1/2011Department of Energy Resources' Motion for Extension of Time to submit Pre-filed Testimony until April 15, 2011. By Steven I. Venezia. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/4111doermtcs.pdf
Granted Motion3/31/2011GRANTED - Motion on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil for Extension of Deadline to File Responses to Information Requests. By Benjamin Spruill, Hearing Officer. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/33111dpugrmt.pdf
Unitil Motion for Extension3/31/2011Motion on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil for Extension of Deadline to File Responses to Information Requests. Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/33111fgermt.pdf
Response to AG's 2nd set of IR3/28/2011Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General's Second Set of Common Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/32811fgerag2.pdf
Unitil Response to AG Sets 1 and 23/25/2011Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General's First and Second Sets of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/32511fgerag.pdf
Attachment AG1-53/25/2011Responses of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General's First and Second Sets of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/32511fgeraga.xlsx
AG's 4th set of IR3/18/2011The Attorney General's Fourth Set of Common Information and Document Requests. By Danielle C. Rathbun. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811agir4.pdf
DPU's 1st set of IR3/18/2011The Department's First Set of Common Information Requests to the Massachusetts Gas Program Administrators. By Benjamin N. Spruill, Hearing Officer. DPU 10-140/10-141/10-143/10-144/10-145/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811dpuir1.pdf
DPU's 3rd set of IR3/18/2011The Department's Third Set of Common Information Requests to the Massachusetts Gas Program Administrators. By Benjamin N. Spruill, Hearing Officer. DPU 10-140/10-141/10-143/10-144/10-145/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811dpuir3.pdf
DPU's 2nd set of IR3/18/2011The Department's Second Set of Common Information Requests to the Massachusetts Gas Program Administrators. By Benjamin N. Spruill, Hearing Officer. DPU 10-140/10-141/10-143/10-144/10-145/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811dpuir2.pdf
EE Discovery, Witness Notice3/18/2011The Low-Income Weatherization and Fuel Assistance Program Network, the Massachusetts Energy Directors Association and the Low-Income Energy Affordability Network's First Common Set of Data Requests. Notice of Intent to Sponsor Witnessess. By Jerrold Oppenheim. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811linir.pdf
AG's 3rd set of IR3/18/2011The Attorney General's Third Set of Common Information and Document Requests. By Danielle C. Rathbun. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31811agir3.pdf
DOER's Notice3/17/2011Department of Energy Resouces' Notice of Intervenor Testimony. By Steven I. Venezia. DPU 10-140/10-141/10-142/10-143/10-144/10-145/10-146/10-147/10-148/10-149/10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31711doernt.pdf
DPU's 2nd set of IR3/16/2011Department of Public Utilities' Second Set of Information Responses to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Benjamin N. Spruill, Hearing Officer. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/31611dpuir2.pdf
AG's 2nd set of IR3/14/2011Attorney General's Second Set of Common Information and Document Requests. By Danielle C. Rathbun. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31411agir2.pdf
AG's 2nd set of IR3/14/2011Attorney General's Second Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Danielle C. Rathbun. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/31411agir2.pdf
AG's 1st set of IR3/11/2011Attorney General's First Set of Information and Document Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Danielle C. Rathbun. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/31111agir1.pdf
Letter3/11/2011Letter on behalf of the Petitioners concerning ongoing negotiations between the Program Administrators and interested stakeholders regarding the 2011 Mid-Term Modifications to the Program Administrators' Three-Year Energy Efficiency Plans. By Sarah B. Knowlton, John K. Habib, Jo Ann Bodemer, Kevin Penders, Emmett Lyne, and Donald Wells. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/31111ptnlt.pdf
Responses3/8/2011Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Attorney General's First Set of Common Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/3811fgerspag.pdf
 3/1/2011Procedural Schedule and Ground Rules. By Benjamin Spruill, Hearing Officer. DPU 10-150 
Responses3/1/2011Supplemental response of Fitchburg Gas and Electric Light Company d/b/a Unitil to DPU-1-2. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/3111fgesrsp.pdf
AG's 1st set of IR2/22/2011Attorney General's First Set of Common Information and Document Requests. By Danielle C. Rathbun. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-140/22211agir1.pdf
Ruling2/18/2011Hearing Officer Ruling on Motions to Intervene and Motions for Limited Participant Status. By Benjamin Spruill, Hearing Officer. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/21811dpurul.pdf
Responses2/15/2011Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's First Set of Information Requests: DPU 1-24, 1-27. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/21511fgerd1.pdf
Unitil Responses to DPU Set 12/11/2011Responses on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department's First Set of Information Requests: DPU 1-1, 1-2, 1-3, 1-4, 1-5, 1-6, 1-7, 1-8, 1-9, 1-10, 1-11, 1-12, 1-13, 1-14, 1-15, 1-16, 1-17, 1-18, 1-19, 1-20, 1-21, 1-22, 1-23, 1-25, 1-26, 1-28, 1-29. Motion for Extension to File Remaining Information Requests: DPU 1-24, 1-27. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/21111fgerspd1.pdf
 2/9/2011Memorandum to Parties: Joint Procedural Conference scheduled for February 17, 2011, starting at 3:30 p.m. at the Department's Offices. By Benjamin Spruill and Jeffrey Leupold, Hearing Officers. DPU 10-140, 10-141, 10-142, 10-143, 10-144, 10-145, 10-146, 10-147, 10-148, 10-149, 10-150 
DPU's 1st set of IR1/27/2011The Department's First Set of Information Requests to Fitchburg Gas and Electric Light Company d/b/a Unitil. By Benjamin N. Spruill, Hearing Officer. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/12711dpuir1.pdf
FG&E Return of Service1/26/2011Return of Service Affidavit on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil. By Gary Epler. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/12611fgertsv.pdf
Order of Notice1/14/2011Order of Notice, and Notice of Filing and Rescheduled Public Hearing, to be held on February 2, 2011, at 2:00 p.m., at the Department of Public Utilities. By Mark D. Marini, Secretary. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11411dpuordn.pdf
Notice of Filing1/14/2011Order of Notice, and Notice of Filing and Rescheduled Public Hearing, to be held on February 2, 2011, at 2:00 p.m., at the Department of Public Utilities. By Mark D. Marini, Secretary. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11411dpuntfl.pdf
Cover Letter1/10/2011Department of Energy Resources files "Review of the Program Administrator-Proposed Mid-Term Modifications for 2011: Consultant Report to the Energy Efficiency Advisory Council" (Revised December 9, 2010). By Steven I. Venezia. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11011doerrplt.pdf
Report1/10/2011Department of Energy Resources files "Review of the Program Administrator-Proposed Mid-Term Modifications for 2011: Consultant Report to the Energy Efficiency Advisory Council" (Revised December 9, 2010). By Steven I. Venezia. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11011doerrpt.pdf
Certificate of Service1/10/2011Department of Energy Resources files "Review of the Program Administrator-Proposed Mid-Term Modifications for 2011: Consultant Report to the Energy Efficiency Advisory Council" (Revised December 9, 2010). By Steven I. Venezia. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11011doerrpcs.pdf
FG&E Return of Service1/6/2011Return of Service on behalf of Fitchburg Gas and Electric Light Company d/b/a Unitil. By Gary Epler. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/1611fgertsv.pdf
Cover Letter12/29/2010Fitchburg Gas and Electric Light Company d/b/a Unitil's response to Department of Energy Resources' First Set of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/122910fgerl.pdf
Response to DOER 1-112/29/2010Fitchburg Gas and Electric Light Company d/b/a Unitil's response to Department of Energy Resources' First Set of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/122910fgers.pdf
FGE 2011 PARIS Template G12/29/2010Fitchburg Gas and Electric Light Company d/b/a Unitil's response to Department of Energy Resources' First Set of Information Requests. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/122910fgera.xls
Resolution12/22/2010Resolution of the Energy Efficiency Advisory Council Regarding the 2011 Program Administrators' Proposed Mid-Term Modifications, and Energy Efficiency Advisory Council Consultant Report (Revised December 9, 2010). By Steven I. Venezia. DPU 10-140 / 10-141 / 10-142 / 10-143 / 144 / 10-145 / 10-146 / 10-147 / 10-148 / 10-149 / 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-140/122210resolution.pdf
Cover Letter12/16/2010Instructions and First Set of Info and Document Requests of the Department of Energy Resources along with Certificate of Service. By Steven Venezia. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/121610doerir1l.pdf
DOER's 1st set of IR12/16/2010Instructions and First Set of Info and Document Requests of the Department of Energy Resources along with Certificate of Service. By Steven Venezia. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/121610doerir1.pdf
Order of Notice12/6/2010Order of Notice, and Notice of Filing and Public Hearing, to be held on January 12, 2011, at 2 p.m. at the Department's Offices, One South Station, Boston, MA. By Mark D. Marini, Secretary. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/12610dpuordn.pdf
Notice of Filing12/6/2010Order of Notice, and Notice of Filing and Public Hearing, to be held on January 12, 2011, at 2 p.m. at the Department's Offices, One South Station, Boston, MA. By Mark D. Marini, Secretary. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/12610dpuntfl.pdf
Petition12/3/2010Petition to Intervene of the Low-Income Weatherization and Fuel Assistance Program Network, Massachusetts Energy Directors Association and the Low-Income Energy Affordability Network. By Jerrold Oppenheim. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-140/12310lipt.pdf
Unitil Electric Bill Impact Filing11/15/2010Fitchburg Gas and Electric Light Company d/b/a Unitil files supplemental information to its initial petition. By Kevin F. Penders. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/111510fgesin.pdf
Cover letter11/12/2010Department of Energy Resources Petition to Intervene, Notice of Appearance of Counsel, and Certificate of Service. By Steven Venezia. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/111210doerptl.pdf
DOER Petition11/12/2010Department of Energy Resources Petition to Intervene, Notice of Appearance of Counsel, and Certificate of Service. By Steven Venezia. DPU 10-150.http://www.env.state.ma.us/dpu/docs/gas/10-150/111210doerptn.pdf
 11/10/2010Assignment of Hearing Officer Benjamin Spruill. By Chair Berwick and Commissioner Woolf. DPU 10-150. 
AG's Notice of Intervention11/8/2010Attorney General's Notice of Intervention and Appearance of Counsel. By Danielle C. Rathbun. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/11810agntint.pdf
Unitil Electric MTM Filing10/29/2010Petition of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Public Utilities for review and approval of its mid-term modification to its 2011 Energy Efficiency Programs. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/102910fgemtmf.pdf
Exhibit D - Electric PI Model10/29/2010Petition of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Public Utilities for review and approval of its mid-term modification to its 2011 Energy Efficiency Programs. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/102910fgemtmed.xls
Exhibit H 08-50 Tables- FGE Electric10/29/2010Petition of Fitchburg Gas and Electric Light Company d/b/a Unitil to the Department of Public Utilities for review and approval of its mid-term modification to its 2011 Energy Efficiency Programs. DPU 10-150http://www.env.state.ma.us/dpu/docs/gas/10-150/102910fgemtmeh.xlsx





Docket Service List
FirstLastCompanyAddressCityStateZipEmailFAXPhone
JerroldOppenheim, Esq.Democracy and Regulation57 Middle StreetGloucesterMA01930JerroldOpp@Yahoo.com978-283-0957978-283-0897
StevenVenezia, Esq.Department of Energy Resources100 Cambridge Street, Suite 1020BostonMA02114steven.venezia@state.ma.us617-727-0030617-727-4732
KevinPenders, Esq.Keegan Werlin LLP265 Franklin Street, 6th FloorBostonMA02110kpenders@keeganwerlin.com617-951-1354617-951-1400
MatthewSaunders, Esq.Office of the Attorney GeneralOne Ashburton PlaceBostonMA02108Matthew.Saunders@state.ma.us 617-727-2200
PaulHorowitzPAH Associates9 Quorn Hunt RoadWest SimsburyCT06092pahorowitz@earthlink.net860-658-4692860-658-9506
JeffSchlegelSchlegel & Associates1167 W. Samalayuca DriveTusconAZ85704-3224schlegelj@aol.com520-797-4393520-797-4392